$ 0
0
$ 0
0

Komatsu PC210-8, PC210LC, PC210NLC-8, PC230NHD-8, PC240LC, PC240NLC-8 Hydraulic Excavator Operation and Maintenance Manual (UEAM004904)

Format: PDF (Printable Document)

File Language: English

File Pages: 464

File Size: 14.92 MB (Speed Download Link)

Brand: Komatsu

Model: PC210-8, PC210LC, PC210NLC-8, PC230NHD-8, PC240LC, PC240NLC-8 Hydraulic Excavator

Book No: UEAM004904

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC210-8, PC210LC, PC210NLC-8, PC230NHD-8, PC240LC, PC240NLC-8 Hydraulic Excavator Operation and Maintenance Manual (UEAM004904)

Komatsu PC210-8, PC210LC, PC210NLC-8, PC230NHD-8, PC240LC, PC240NLC-8 Hydraulic Excavator Operation and Maintenance Manual (UEAM004904)

📘 Show Index

Komatsu PC210-8, PC210LC, PC210NLC-8, PC230NHD-8, PC240LC, PC240NLC-8 Hydraulic Excavator Index:

  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
      • NOISE (PC210,210LC,210NLC, PC230NHD)
      • NOISE (PC240LC,240NLC)
      • Vibration levels
    • INTRODUCTION
      • DIRECTIONS OF MACHINE
      • BREAKING-IN THE NEW MACHINE
    • PRODUCT INFORMATION
      • PRODUCT IDENTIFICATION NUMBER (PIN)/MACHINE SERIAL NO. PLATE
      • ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
      • SERVICE METER LOCATION
      • TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
      • MACHINE SERIAL PLATES
      • FOREWORD
      • SAFETY
      • OPERATION
      • MAINTENANCE
      • SPECIFICATIONS
      • ATTACHMENTS AND OPTIONS
      • SUPER LONG FRONT BOOM AND ARM PC210/240-8
      • INDEX
      • COLOPHON
  • SAFETY
    • SAFETY INFORMATION
    • SAFETY LABELS
      • LOCATION OF SAFETY LABELS
      • SAFETY LABELS
    • SAFETY INFORMATION
      • SAFETY RULES
      • IF PROBLEMS ARE FOUND
      • WORKING WEAR AND PERSONAL PROTECTIVE ITEMS
      • FIRE EXTINGUISHER AND FIRST AID KIT
      • SAFETY EQUIPMENT
      • KEEP MACHINE CLEAN
      • KEEP OPERATOR’S COMPARTMENT CLEAN
      • LEAVING OPERATOR’S SEAT WITH LOCK
      • HANDRAILS AND STEPS
      • MOUNTING AND DISMOUNTING
      • NO PERSONS ON ATTACHMENTS
      • DO NOT GET CAUGHT IN ARTICULATED PORTION
      • BURN PREVENTION
      • ACTION IF FIRE OCCURS
      • WINDSHIELD WASHER FLUID
      • FALLING OBJECTS, FLYING OBJECTS AND INTRUDING OBJECTS PREVENTION
      • ATTACHMENT INSTALLATION
      • ATTACHMENT COMBINATIONS
      • CAB WINDOW GLASSES
      • UNAUTHORIZED MODIFICATIONS
      • SAFETY AT JOBSITE
      • WORKING ON LOOSE GROUND
      • DISTANCE TO HIGH VOLTAGE CABLES
      • ENSURE GOOD VISIBILITY
      • VENTILATION FOR ENCLOSED AREA
      • SIGNALMAN’S SIGNAL AND SIGNS
      • EMERGENCY EXIT FROM OPERATOR’S CAB
      • ELECTROMAGNETIC INTERFERENCE
      • ASBESTOS DUST HAZARD PREVENTION
    • SAFETY MACHINE OPERATION
      • STARTING ENGINE
      • OPERATION
      • TRANSPORTATION
      • BATTERY
      • TOWING
      • LIFTING OBJECTS WITH BUCKET
    • SAFETY MAINTENANCE INFORMATION
      • WARNING TAG
      • KEEP WORK PLACE CLEAN AND TIDY
      • APPOINT LEADER WHEN WORKING WITH OTHERS
      • STOP ENGINE BEFORE CARRYING OUT MAINTENANCE
      • TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
      • PROPER TOOLS
      • ACCUMULATOR
      • HANDLING GAS SPRING
      • PERSONNEL
      • ATTACHMENTS
      • WORK UNDER THE MACHINE
      • NOISE
      • WHEN USING HAMMER
      • WELDING WORKS
      • REMOVING BATTERY TERMINALS
      • SAFETY FIRST WHEN USING HIGH-PRESSURE GREASE TO ADJUST TRACK TENSION
      • DO NOT DISASSEMBLE RECOIL SPRINGS
      • SAFETY RULES FOR HIGH-PRESSURE OIL
  • OPERATION
    • MACHINE VIEW ILLUSTRATIONS
      • OVERALL MACHINE VIEW
      • CONTROLS AND GAUGES
    • DETAILED CONTROLS AND GAUGES
      • MONITORING SYSTEM
      • SWITCHES
      • CONTROL LEVERS AND PEDALS
      • CEILING WINDOW
      • WINDSHIELD
      • EMERGENCY ESCAPE HAMMER
      • DOOR LOCK
      • CAP WITH LOCK
      • DRINK BOX
      • MAGAZINE BOX
      • ASHTRAY
      • AIR CONDITIONER CONTROLS
      • RADIO
      • AUXILIARY ELECTRIC POWER
      • FUSE
      • FUSIBLE LINK
      • CONTROLLER
      • TOOL BOX
      • GREASE GUN HOLDER
    • MACHINE OPERATIONS AND CONTROLS
      • BEFORE STARTING ENGINE
      • REFUELLING PUMP
      • STARTING ENGINE
      • AFTER STARTING ENGINE
      • STOPPING THE ENGINE
      • MACHINE OPERATION
      • STEERING THE MACHINE
      • SWINGING
      • WORK EQUIPMENT CONTROLS AND OPERATIONS
      • WORKING MODE
      • PROHIBITED OPERATIONS
      • GENERAL OPERATION INFORMATION
      • TRAVELLING ON SLOPES
      • ESCAPE FROM MUD
      • RECOMMENDED APPLICATIONS
      • BUCKET REPLACEMENT AND INVERSION
      • PARKING MACHINE
      • CHECK AFTER SHUT OFF ENGINE
      • MACHINE INSPECTION AFTER DAILY WORK
      • LOCKING
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • SPECIAL TRANSPORTATION INSTRUCTIONS FOR PC210NLC-8 AND PC230NHD-8
      • LOADING AND UNLOADING WITH TRAILER
      • LIFTING MACHINE
    • COLD WEATHER OPERATION
      • COLD WEATHER OPERATION INFORMATION
      • AFTER DAILY WORK COMPLETION
      • AFTER COLD WEATHER SEASON
    • LONG TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STARTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLES AND ACTIONS
      • RUNNING OUT OF FUEL
      • PHENOMENA THAT ARE NOT FAILURES
      • TOWING THE MACHINE
      • LIGHTWEIGHT TOWING HOLE
      • SEVERE JOB CONDITION
      • DISCHARGED BATTERY
      • OTHER TROUBLE
  • MAINTENANCE
    • MAINTENANCE INFORMATION
    • OUTLINE OF SERVICE
      • HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
      • EXPLANATION OF LUBRICATION CHART DECAL
      • ELECTRIC SYSTEM MAINTENANCE
    • WEAR PARTS
      • WEAR PARTS LIST
    • RECOMMENDED FUEL, COOLANT, AND LUBRICANT
      • RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
    • TIGHTENING TORQUE SPECIFICATIONS
      • TIGHTENING TORQUE LIST
    • SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS LIST
    • MAINTENANCE SCHEDULE
      • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
    • MAINTENANCE PROCEDURE
      • INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
      • INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 100 HOURS MAINTENANCE
      • EVERY 250 HOURS MAINTENANCE
      • EVERY 500 HOURS MAINTENANCE
      • EVERY 1000 HOURS MAINTENANCE
      • EVERY 2000 HOURS MAINTENANCE
      • EVERY 4000 HOURS MAINTENANCE
      • EVERY 5000 HOURS MAINTENANCE
      • EVERY 8000 HOURS MAINTENANCE
  • SPECIFICATIONS
    • SPECIFICATIONS
      • MONOBOOM WORKING RANGE
      • PC210-8 WORKING RANGE (2-PIECE BOOM)
      • PC230-8 WORKING RANGE (2-PIECE BOOM)
      • PC240-8 WORKING RANGE (2-PIECE BOOM)
      • EXPLANATION OF LIFTING CAPACITY CHART PC210, PC210LC, PC210NLC, PC230NHD-8
      • EXPLANATION OF LIFTING CAPACITY CHART PC240LC, PC240NLC-8
      • EXPLANATION OF LIFTING CAPACITY CHART PC210, PC210LC, PC210NLC-8, pc230nhd-8 2 PIECE BOOM
      • EXPLANATION OF LIFTING CAPACITY CHART (PC240LC,NLC-8 2 PIECE BOOM)
      • PC240LC-8, PC240NLC-8 2 PIECE BOOM
  • ATTACHMENTS AND OPTIONS
    • GENERAL PRECAUTIONS FOR SAFETY
      • PRECAUTIONS WHEN SELECTING
      • READ THE INSTRUCTION MANUAL THOROUGHLY
      • PRECAUTIONS WHEN REMOVING OR INSTALLING
      • PRECAUTIONS WHEN USING
    • HYDRAULIC QUICK COUPLER PIPING
      • LOCATIONS
      • OPERATION
    • BUCKET WITH HOOK
      • HOOK CONDITION
      • PROHIBITED OPERATIONS
    • MACHINE READY FOR ATTACHMENT
      • LOCATIONS
      • HYDRAULIC CIRCUIT
      • ATTACHMENT REMOVAL AND INSTALLATION
      • ATTACHMENT OPERATIONS
      • LONG TERM STORAGE
      • SPECIFICATIONS
    • ATTACHMENT GUIDE
      • COMBINATIONS OF WORK EQUIPMENT
      • SELECTION OF TRACK SHOES
      • SELECTION OF BUCKET TEETH
      • STANDARDS FOR SELECTING VERTICAL PIN TYPE AND HORIZONTAL PIN TYPE TEETH
      • HANDLING OF RUBBER PAD SHOE AND ROAD LINER
      • TRAPEZOIDAL BUCKET
      • HANDLING EXTENSION ARM
      • HANDLING CLAMSHELL BUCKET
    • RECOMMENDED ATTACHMENT OPERATIONS
      • HYDRAULIC BREAKER
    • PC210/230-8 2-PC BOOM
      • FEATURES OF 2-PIECE BOOM & ARM
      • OPERATION
      • TRANSPORTATION
      • LUBRICATING
    • PC240-8 2-PC BOOM
      • FEATURES OF 2-PIECE BOOM & ARM
      • OPERATION
      • TRANSPORTATION
    • PC240-8 STRAIGHT BOOM
      • GENERAL VIEW OF MACHINE
      • CAUTION ITEMS
      • CONTROL (AUXILIARY HYDRAULIC CIRCUITS)
      • CRUSHER CONTROL PEDAL FOR OPENING AND CLOSING
      • CRUSHER CONTROL BUTTON FOR ROTATION
      • CEILING WINDOW WIPER SWITCH (3)
      • WORKING RANGE (PC 240 STRAIGHT BOOM)
      • TRANSPORTATION (Straight Boom equipment)
    • HANDLING MACHINES EQUIPPED WITH KOMTRAX
      • BASIC PRECAUTIONS
  • SUPER LONG FRONT BOOM AND ARM PC210/240-8
    • OPERATION INSTRUCTION FOR SUPER LONG FRONT BOOM AND ARM
      • WORKING MODES
      • CONTROL LEVERS, PEDALS
      • ‘WEEDCUTTER’ MACHINE CONTROL LEVERS, PEDALS
      • TRANSPORT & STORAGE OF SUPER LONG FRONT MACHINE
      • WORKING RANGE OF SUPER LONG FRONT
      • LIFTING CAPACITY PC210 LC 15 m SUPER LONG FRONT
      • LIFTING CAPACITY PC210 NLC 15 m SUPER LONG FRONT
      • LIFTING CAPACITY PC240 LC 18 m SUPER LONG FRONT
      • LIFTING CAPACITY PC240 NLC 18 m SUPER LONG FRONT
    • MAINTENANCE
      • SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
      • EVERY 50 HOURS SERVICE
      • EVERY 100 HOURS SERVICE
  • INDEX
    • Numerics
    • <A>
    • <B>
    • <C>
    • <D>
    • <E>
    • <F>
    • <G>
    • <H>
    • <I>
    • <K>
    • <L>
    • <M>
    • <N>
    • <O>
    • <P>
    • <R>
    • <S>
    • <T>
    • <V>
    • <W>
    • <Y>
  • COLOPHON

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop