$ 0
0
$ 0
0

Komatsu D575A-2 Bulldozer Operation and Maintenance Manual (SEAMN02501)

Format: PDF (Printable Document)

File Language: English

File Pages: 260

File Size: 13.06 MB (Speed Download Link)

Brand: Komatsu

Model: D575A-2 Bulldozer

Book No: SEAMN02501

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu D575A-2 Bulldozer Operation and Maintenance Manual (SEAMN02501)

Komatsu D575A-2 Bulldozer Operation and Maintenance Manual (SEAMN02501)

📘 Show Index

Komatsu D575A-2 Bulldozer Index:

  • COVER
  • 1. FOREWORD
  • 2. SAFETY INFORMATION
  • 3. INTRODUCTION
    • 3.1 INTENDED USE
    • 3.2 FEATURES
    • 3.3 BREAKING IN THE MACHINE
  • 4. LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
    • 4.1 MACHINE SERIAL NO. PLATE POSITION
    • 4.2 ENGINE SERIAL NO. PLATE POSITION
    • 4.3 TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 5. CONTENTS
  • SAFETY
    • 6. GENERAL PRECAUTIONS
    • 7. PRECAUTIONS DURING OPERATION
      • 7.1 BEFORE STARTING ENGINE
      • 7.2 AFTER STARTING ENGINE
      • 7.3 BATTERY
    • 8. PRECAUTIONS FOR MAINTENANCE
      • 8.1 BEFORE CARRYING OUT MAINTENANCE
      • 8.2 DURING MAINTENANCE
    • 9. POSITION FOR ATTACHING SAFETY LABELS
  • OPERATION
    • 10. GENERAL VIEW
      • 10.1 GENERAL VIEW OF MACHINE
      • 10.2 GENERAL VIEW OF CONTROLS AND GAUGES
    • 11. EXPLANATION OF COMPONENTS
      • 11.1 FRONT RANEL
      • 11.2 SWITCHES
      • 11.3 CONTROL LEVERS AND PEDALS
      • 11.4 FUSE BOX
      • 11.5 DOOR LOCK
      • 11.6 CAP WITH LOCK
      • 11.7 HANDLING OF ENGINE OIL FILTER CAP
      • 11.8 OPERATING THE CAR STEREO
      • 11.9 OPERATING THE AIR CONDITIONER
      • 11.10 CONTROLLER
    • 12. OPERATION
      • 12.1 CHECK BEFORE STARTING ENGINE
      • 12.2 STARTING ENGINE
      • 12.3 OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • 12.4 MOVING MACHINE
      • 12.5 SHIFTING GEAR
      • 12.6 SHIFTING BETWEEN FORWARD AND REVERSE
      • 12.7 STEERING MACHINE
      • 12.8 STOPPING MACHINE
      • 12.9 PRECAUTIONS FOR OPERATION
      • 12.10 WORK POSSIBLE USING BULLDOZER
      • 12.11 EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER
      • 12.12 OPERATING RIPPER
      • 12.13 ADJUSTMENT OF WORK EQUIPMENT
      • 12.14 PARKING MACHINE
      • 12.15 CHECK AFTER FINISHING WORK
      • 12.16 STOPPING ENGINE
      • 12.17 CHECK AFTER STOPPING ENGINE
      • 12.18 LOCKING
      • 12.19 TIPS FOR LONGER UNDERCARRIAGE LIFE
    • 13. HANDLING ACCUMULATOR
      • 13.1 RELEASING REMAINING PRESSURE IN ACCUMULATOR CIRCUIT
    • 14. COLD WEATHER OPERATION
      • 14.1 PRECAUTIONS FOR LOW TEMPERATURE
      • 14.2 AFTER COMPLETION OF WORK
      • 14.3 AFTER COLD WEATHER
    • 15. LONG-TERM STORAGE (MODE THAN ONE MONTH)
      • 15.1 BEFORE STORAGE
      • 15.2 DURING STORAGE
      • 15.3 AFTER STORAGE
    • 16. TROUBLESHOOTING
      • 16.1 AFTER RUNNING OUT OF FUEL
      • 16.2 IF BATTERY IS DISCHARGED
      • 16.3 OTHER TROUBLE
      • 16.4 WHEN MODE SELECTION SYSTEM CAUTION LAMP FLASHES
  • MAINTENANCE
    • 17. GUIDES TO MAINTENANCE
    • 18. OUTLINES OF SERVICE
      • 18.1 OUTLINE OF OIL,FUEL,COOLANT
      • 18.2 RELATING TO ELECTRIC SYSTEM
    • 19. WEAR PARTS LIST
    • 20. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • 21. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • 21.1 INTRODUCTION OF NECESSARY TOOLS
      • 21.2 TORQUE LIST
    • 22. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
    • 23. MAINTENANCE SCHEDULE CHART
      • 23.1 MAINTENANCE SCHEDULE CHART
    • 24. SERVICE PROCEDURE
      • 24.1 INITIAL 250 HOURS SERVICE
      • 24.2 WHEN REQUIRED
      • 24.3 CHECK BEFORE STARTING
      • 24.4 EVERY 250 HOURS SERVICE
      • 24.5 EVERY 500 HOURS SERVICE
      • 24.6 EVERY 1000 HOURS SERVICE
      • 24.7 EVERY 2000 HOURS SERVICE
      • 24.8 EVERY 4000 HOURS SERVICE
  • SPECIFICATIONS
    • 25. SPECIFICATIONS
  • OPTIONS,ATTACHMENTS
    • 26. GENERAL PRECAUTIONS
      • 26.1 PRECAUTIONS RELATED TO SAFETY
    • 27. USING SEAT BELT
      • 27.1 FASTEN THE BELT AND REMOVE IT IN THE FOLLOWING MANNER
  • RADIO-CONTROLLED BULLDOZER
    • 28. RADIO-CONTROLLED BULLDOZER
      • TO THE USER
      • GENERAL LOCATIONS
      • INSTRUMENTS AND CONTROLS
      • MAIN COMPONENTS OF RADIO CONTROL
      • TRANSMITTER CONTROL PANEL (OPERATING PANEL)
      • RECEIVER CONTROL DEVICE (RECEIVER)
      • RECEIVER CHECKER LED OPERATION TABLE
      • WIRELESS SYSTEM USING TRANSMITTER AND RECEIVER
      • CHARGER,ADAPTER
      • AUTOMATIC MACHINE SUPERVISOR AND ALARMS
      • PROTECTIVE AND SAFETY FUNCTIONS
      • METHOD OF FITTING CONTROL PANEL
      • PROCEDURE FOR RADIO-CONTROLLED OPERATION
      • POINTS TO REMEMBER FOR RADIO-CONTROLLED OPERATION
      • TROUBLESHOOTING DEVICE FOR RADIO CONTROL SYSTEM (OK MONITOR)
      • TROUBLESHOOTING LAMPS FOR CONTROL PANEL
      • TROUBLESHOOTING OF RECEIVER
      • SWITCHING BETWEEN RADIO-CONTROLLED OPERATION AND DIRECT OPERATION
      • RADIO CONTROL OPERATIONS
      • INSPECTION AND MAINTENANCE OF RADIO CONTROL DEVICE
      • TROUBLESHOOTING GUIDE
      • SPECIFICATIONS

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop