$ 0
0
$ 0
0

Komatsu PC03-2 Hydraulic Excavator Operation and Maintenance Manual (SEAM021600)

Format: PDF (Printable Document)

File Language: English

File Pages: 252

File Size: 6.42 MB (Speed Download Link)

Brand: Komatsu

Model: PC03-2 Hydraulic Excavator

Book No: SEAM021600

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC03-2 Hydraulic Excavator Operation and Maintenance Manual (SEAM021600)

Komatsu PC03-2 Hydraulic Excavator Operation and Maintenance Manual (SEAM021600)

📘 Show Index

Komatsu PC03-2 Hydraulic Excavator Index:

  • COVER
  • 1. FOREWORD
  • 2. SAFETY INFORMATION
  • 3. INTRODUCTION
  • 4. LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 5. CONTENTS
  • SAFETY
    • 6. GENERAL PRECAUTIONS
    • 7. PRECAUTIONS DURING OPERATION
      • 7.1 BEFORE STARTING ENGINE
      • 7.2 OPERATING MACHINE
      • 7.3 TRANSPORTATION
      • 7.4 BATTERY
      • 7.5 TOWING
      • 7.6 BUCKET WITH HOOK
    • 8. PRECAUTIONS FOR MAINTENANCE
      • 8.1 BEFORE CARRYING OUT MAINTENANCE
      • 8.2 DURING MAINTENANCE
    • 9. POSITION FOR ATTACHING SAFETY LABELS
  • OPERATION
    • 10. GENERAL VIEW
      • 10.1 GENERAL VIEW OF MACHINE
      • 10.2 GENERAL VIEW OF CONTROLS AND GAUGES
    • 11. EXPLANATION OF COMPONENTS
      • 11.1 METERS,LAMPS
      • 11.2 SWITCHES
      • 11.3 CONTROL LEVERS,PEDALS
      • 11.4 ENGINE HOOD (WITH LOCK)
      • 11.5 FUSE BOX
      • 11.6 FUSIBLE LINK
      • 11.7 TOOL COMPARTMENT
    • 12. OPERATION
      • 12.1 CHECK BEFORE STARTING ENGINE
      • 12.2 STARTING ENGINE
      • 12.3 OPERATION AND CHECK AFTER STARTING ENGINE
      • 12.4 MOVING MACHINE OFF
      • 12.5 STEERING MACHINE
      • 12.6 STOPPING MACHINE
      • 12.7 SWINGING
      • 12.8 OPERATION OF WORK EQUIPMENT
      • 12.9 PROHIBITIONS FOR OPERATION
      • 12.10 PRECAUTIONS FOR OPERATION
      • 12.11 PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
      • 12.12 HOW TO ESCAPE FROM MUD
      • 12.13 WORK POSSIBLE USING HYDRAULIC EXCAVATOR
      • 12.14 REPLACEMENT OF BUCKET
      • 12.15 HANDLING RUBBER SHOES
      • 12.16 PARKING MACHINE
      • 12.17 CHECKS AFTER FINISHING WORK
      • 12.18 STOPPING ENGINE
      • 12.19 CHECKS AFTER STOPPING ENGINE
    • 13. TRANSPORTATION
      • 13.1 LOADING,UNLOADING WORK
      • 13.2 METHOD OF LIFTING MACHINE
      • 13.3 PRECAUTIONS FOR LOADING
      • 13.4 PRECAUTIONS FOR TRANSPORTATION
    • 14. COLD WEATHER OPERATION
      • 14.1 PRECAUTIONS FOR LOW TEMPERATURE
      • 14.2 PRECAUTIONS AFTER COMPLETION OF WORK
      • 14.3 AFTER COLD WEATHER
    • 15. LONG-TERM STORAGE
      • 15.1 BEFORE STORAGE
      • 15.2 DURING STORAGE
      • 15.3 AFTER STORAGE
    • 16. TROUBLESHOOTING
      • 16.1 PHENOMENA THAT ARE NOT FAILURES
      • 16.2 METHOD OF TOWING MACHINE
      • 16.3 IF BATTERY IS DISCHARGED
      • 16.4 OTHER TROUBLE
  • MAINTENANCE
    • 17. GUIDES TO MAINTENANCE
    • 18. OUTLINES OF SERVICE
      • 18.1 OUTLINE OF OIL,FUEL
      • 18.2 OUTLINE OF ELECTRIC SYSTEM
      • 18.3 OUTLINE OF HYDRAULIC SYSTEM
    • 19. WEAR PARTS LIST
    • 20. USE OF FUEL AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • 21. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • 21.1 INTRODUCTION OF NECESSARY TOOLS
      • 21.2 TORQUE LIST
    • 22. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
    • 23. MAINTENANCE SCHEDULE CHART
      • 23.1 MAINTENANCE SCHEDULE CHART
      • 23.2 MAINTENANCE INTERVAL WHEN USING HYDRAULIC BREAKER
    • 24. SERVICE PROCEDURE
      • 24.1 INITIAL 100 HOURS SERVICE
      • 24.2 INITIAL 250 HOURS SERVICE
      • 24.3 INITIAL 500 HOURS SERVICE
      • 24.4 WHEN REQUIRED
      • 24.5 CHECK BEFORE STARTING
      • 24.6 EVERY 250 HOURS SERVICE
      • 24.7 EVERY 500 HOURS SERVICE
      • 24.8 EVERY 2000 HOURS SERVICE
  • SPECIFICATIONS
    • 25. SPECIFICATIONS
  • OPTIONS,ATTACHMENTS
    • 26. GENERAL PRECAUTIONS
      • 26.1 PRECAUTIONS RELATED TO SAFETY
    • 27. INTRODUCTION OF OPTIONAL PARTS AND ATTACHMENTS
      • 27.1 SPECIFICATIONS,USES
      • 27.2 ATTACHMENTS INSTALLATION COMBINATION
    • 28. HANDLING BUCKET WITH HOOK
      • 28.1 CHECKING FOR DAMAGE TO BUCKET WITH HOOK
      • 28.2 PROHIBITED OPERATIONS
      • 28.3 PRECAUTIONS DURING OPERATIONS
    • 29. HANDLING ARM WITH BUILT-IN BREAKER
      • 29.1 POSTURE OF BUCKET
      • 29.2 REMOVAL AND INSTALLATION OF CHISEL
      • 29.3 PROCEDURE FOR BREAKER OPERATIONS
      • 29.4 PRECAUTIONS WHEN CARRYING OUT BREAKER OPERATIONS
      • 29.5 STOWING CHISEL,DUMMY CHISEL
      • 29.6 PRECAUTIONS WHEN CARRYING OUT BUCKET OPERATIONS
      • 29.7 HANDLING DUMMY LINK
      • 29.8 CHECK BEFORE STARTING
      • 29.9 MAINTENANCE INTERVAL OF WEAR PARTS
      • 29.10 SPECIFICATIONS
    • 30. HANDLING MACHINE WITH 2-PIECE BOOM
      • 30.1 METHOD OF OPERATING 2-PIECE BOOM
      • 30.2 COMPARISON OF WORKING RANGE OF 2-PIECE BOOM AND STANDARD BOOM
    • 31. HANDLING 2-WAY PIPING
      • 31.1 SWITCHING BETWEEN 1-WAY AND 2-WAY
      • 31.2 OPERATING PEDAL
      • 31.3 METHOD OF USING PEDAL LOCK
    • 32. HANDLING VARIABLE GAUGE SPECIFICATION MACHINE
      • 32.1 METHOD OF OPERATING VARIABLE GAUGE
      • 32.2 PRECAUTIONS WHEN DIGGING
      • 32.3 METHOD OF OPERATING VARIABLE BLADE
      • 32.4 SPECIFICATIONS
    • 33. HANDLING CARRY BUCKET
      • 33.1 REMOVAL AND INSTALLATION OF CARRY BUCKET
      • 33.2 METHOD OF SWITCHING OPERATION
      • 33.3 PRECAUTIONS WHEN USING CARRY BUCKET
      • 33.4 SPECIFICATIONS
  • PARTS LIST
    • CONTENTS
    • ELEMENT AND V-BELT
    • PERIODICAL REPLACEMENT CRITICAL PARTS (1/2) (FUEL HOSE)
    • PERIODICAL REPLACEMENT CRITICAL PARTS (2/2) (HYDRAULIC HOSE)
    • WORK EQUIPMENT HOSE
    • WORK EQUIPMENT HOSE (FOR LONG ARM)
    • WORK EQUIPMENT HOSE (FOR BREAKER ARM)
    • WORK EQUIPMENT HOSE (FOR TWO PIECE BOOM) (1/2)
    • WORK EQUIPMENT HOSE (FOR TWO PIECE BOOM) (2/2)
    • LAMP AND FUSE
    • RUBBER TRACK SHOE
    • BUCKET
    • BUCKET (FOR BREAKER ARM AND TWO PIECE BOOM)

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop