$ 0
0
$ 0
0

Komatsu PC300-6, PC300LC-6, PC350, PC350LC-6 Hydraulic Excavator Operation and Maintenance Manual (SEAM009000)

Format: PDF (Printable Document)

File Language: English

File Pages: 261

File Size: 12.56 MB (Speed Download Link)

Brand: Komatsu

Model: PC300-6, PC300LC-6, PC350, PC350LC-6 Hydraulic Excavator

Book No: SEAM009000

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC300-6, PC300LC-6, PC350, PC350LC-6 Hydraulic Excavator Operation and Maintenance Manual (SEAM009000)

Komatsu PC300-6, PC300LC-6, PC350, PC350LC-6 Hydraulic Excavator Operation and Maintenance Manual (SEAM009000)

📘 Show Index

Komatsu PC300-6, PC300LC-6, PC350, PC350LC-6 Hydraulic Excavator Index:

  • COVER
  • 1. FOREWORD
  • 2. SAFETY INFORMATION
  • 3. INTRODUCTION
  • 4. LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 5. CONTENTS
  • SAFETY
    • 6. GENERAL PRECAUTIONS
    • 7. PRECAUTIONS DURING OPERATION
      • 7.1 BEFORE STARTING ENGINE
      • 7.2 OPERATING MACHINE
      • 7.3 TRANSPORTATION
      • 7.4 BATTERY
      • 7.5 TOWING
      • 7.6 BUCKET WITH HOOK
    • 8. PRECAUTIONS FOR MAINTENANCE
      • 8.1 BEFORE CARRYING OUT MAINTENANCE
      • 8.2 DURING MAINTENANCE
    • 9. POSITION FOR ATTACHING SAFETY LABELS
  • OPERATION
    • 10. GENERAL VIEW
      • 10.1 GENERAL VIEW OF MACHINE
      • 10.2 GENERAL VIEW OF CONTROLS AND GAUGES
    • 11. EXPLANATION OF COMPONENTS
      • 11.1 MACHINE MONITOR
      • 11.2 SWITCHES
      • 11.3 CONTROL LEVERS,PEDALS
      • 11.4 CEILING WINDOW
      • 11.5 FRONT WINDOW
      • 11.6 DOOR LOCK
      • 11.7 CAP, COVER WITH LOCK
      • 11.8 HOT AND COOL BOX
      • 11.9 LUGGAGE BOX
      • 11.10 ASHTRAY
      • 11.11 HANDLING AIR CONDITIONER
      • 11.12 CAR RADIO
      • 11.13 FUSE
      • 11.14 FUSIBLE LINK
      • 11.15 CONTROLLERS
      • 11.16 TOOL BOX
      • 11.17 GREASE GUN HOLDER
      • 11.18 HANDLING ACCUMULATOR
    • 12. OPERATION
      • 12.1 CHECK BEFORE STARTING ENGINE
      • 12.2 STARTING ENGINE
      • 12.3 OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • 12.4 MOVING MACHINE OFF
      • 12.5 STEERING MACHINE
      • 12.6 STOPPING MACHINE
      • 12.7 SWINGING
      • 12.8 OPERATION OF WORK EQUIPMENT
      • 12.9 HANDLING WORKING MODE
      • 12.10 PROHIBITIONS FOR OPERATION
      • 12.11 PRECAUTIONS FOR OPERATION
      • 12.12 PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
      • 12.13 HOW TO ESCAPE FROM MUD
      • 12.14 WORK POSSIBLE USING HYDRAULIC EXCAVATOR
      • 12.15 REPLACEMENT AND INVERSION OF BUCKET
      • 12.16 PARKING MACHINE
      • 12.17 CHECK AFTER FINISHING WORK
      • 12.18 STOPPING ENGINE
      • 12.19 CHECK AFTER STOPPING ENGINE
      • 12.20 LOCKING
    • 13. TRANSPORTATION
      • 13.1 LOADING,UNLOADING WORK
      • 13.2 PRECAUTIONS FOR LOADING
      • 13.3 PRECAUTIONS FOR TRANSPORTATION
    • 14. COLD WEATHER OPERATION
      • 14.1 PRECAUTIONS FOR LOW TEMPERATURE
      • 14.2 PRECAUTIONS AFTER COMPLETION OF WORK
      • 14.3 AFTER COLD WEATHER
    • 15. LONG-TERM STORAGE
      • 15.1 BEFORE STORAGE
      • 15.2 DURING STORAGE
      • 15.3 AFTER STORAGE
      • 15.4 STARTING MACHINE AFTER LONG-TERM STORAGE
    • 16. TROUBLESHOOTING
      • 16.1 PHENOMENA THAT ARE NOT FAILURES
      • 16.2 METHOD OF TOWING MACHINE
      • 16.3 USING METHOD FOR LIGHT-WEIGHT TOWING HOLE
      • 16.4 PRECAUTIONS ON PARTICULAR JOBSITES
      • 16.5 IF BATTERY IS DISCHARGED
      • 16.6 OTHER TROUBLE
  • MAINTENANCE
    • 17. GUIDES TO MAINTENANCE
    • 18. OUTLINES OF SERVICE
      • 18.1 OUTLINE OF OIL,FUEL,COOLANT
      • 18.2 OUTLINE OF ELECTRIC SYSTEM
      • 18.3 OUTLINE OF HYDRAULIC SYSTEM
    • 19. WEAR PARTS LIST
    • 20. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • 21. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • 21.1 INTRODUCTION OF NECESSARY TOOLS
      • 21.2 TORQUE LIST
    • 22. PERIODIC REPLACEMENT OF CRITICAL SAFETY PARTS
    • 23. MAINTENANCE SCHEDULE CHART
      • 23.1 MAINTENANCE SCHEDULE CHART
      • 23.2 MAINTENANCE INTERVAL WHEN USING HYDRAULIC BREAKER
    • 24. SERVICE PROCEDURE
      • 24.1 INITIAL 250 HOURS SERVICE
      • 24.2 WHEN REQUIRED
      • 24.3 CHECK BEFORE STARTING
      • 24.4 EVERY 50 HOURS SERVICE
      • 24.5 EVERY 100 HOURS SERVICE
      • 24.6 EVERY 250 HOURS SERVICE
      • 24.7 EVERY 500 HOURS SERVICE
      • 24.8 EVERY 1000 HOURS SERVICE
      • 24.9 EVERY 2000 HOURS SERVICE
      • 24.10 EVERY 4000 HOURS SERVICE
  • SPECIFICATIONS
    • 25. SPECIFICATIONS
  • OPTIONS,ATTACHMENTS
    • 26. GENERAL PRECAUTIONS
      • 26.1 PRECAUTIONS RELATED TO SAFETY
      • 26.2 PRECAUTIONS WHEN INSTALLING ATTACHMENTS
    • 27. HANDLING BUCKET WITH HOOK
      • 27.1 CHECKING FOR DAMAGE TO BUCKET WITH HOOK
      • 27.2 PROHIBITED OPERATIONS
      • 27.3 PRECAUTIONS DURING OPERATIONS
    • 28. USING SEAT BELT
      • 28.1 SEAT BELT
    • 29. HANDLING CAR HEATER
      • 29.1 GENERAL LOCATIONS
      • 29.2 PREPARATION FOR CAR HEATER
    • 30. MACHINES READY FOR ATTACHMENT
      • 30.1 GENERAL LOCATIONS
      • 30.2 HYDRAULIC CIRCUIT
      • 30.3 PROCEDURE FOR REMOVAL AND INSTALATION OF ATTACHMENT
      • 30.4 OPERATION
      • 30.5 LONG TERM STORAGE
      • 30.6 SPECIFICATIONS
    • 31. INTRODUCTION OF ATTACHMENTS
      • 31.1 SPECIFICATION, USE
      • 31.2 ATTACHMENT INSTALLATION COMBINATION TABLE
      • 31.3 SELECTION OF TRACK SHOES
      • 31.4 SELECTION OF BUCKET TEETH
      • 31.5 HANDLING TRAPEZOIDAL BUCKET
    • 32. EXTENDING MACHINE SERVICE LIFE
      • 32.1 HYDRAULIC BREAKER
      • 32.2 POWER RIPPER
      • 32.3 FORK GRAB
      • 32.4 GRAPPLE BUCKET
      • 32.5 SCRAP GRAPPLE
      • 32.6 CRUSHER AND CUTTER
      • 32.7 HYDRAULIC PILE DRIVER
      • 32.8 HYDRAULIC EXCAVATOR WITH MULTI-PURPOSE CRANE
    • 33. AUTO-GREASING SYSTEM
      • 33.1 AUTO-GREASING CONTROLLER
      • 33.2 ACTION WHEN ABNORMALITY OCCURS
      • 33.3 CHECK BEFORE STARTING
      • 33.4 EVERY 50 HOURS SERVICE

Komatsu

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop