Format: Interactive PDF (Printable Document)
File Language: English
Brand: Sandvik
Model: Solo 5
No: 4162
Type of Document: Full Toolman Manual (Service, Operator, Maintenance Manual and Parts Catalog)
$ 150
SOO General Safety.pdf
SOO Maintenance Frontpage general.pdf
SOI General informations.pdf
SOI General pre-start check list.pdf
SOI Hydraulic cylinders – All cylinders.pdf
SOI Hydraulic cylinders – TMK.pdf
S02 Lub Axera Robolt Solo 5.pdf
S02 Lubricant and coolant recommendatim
S03 Accu – Filling device (For Rock Drill
S03 Accumulator.pdf
S03 Rock drill HLX5 Maintenance.pdf
SC Rock drill HLX5 Repair.pdf
SCM Drill feed LHF.pdf
S04 Rotary Actuator HELAC LIO 3600 (Turm
S05 Boom B26LC.pdf
S05 Rotary Actuator 3600 .pdf
S06 Drilling Pump Rexroth-AIOVO.pdf
S06 THC560 SOL05.pdf
S07 Axle FORD new D45.pdf
S07 Pump Rexroth-A4VG.pdf
S07 Tram Axera Robolt Solo 5.pdf
SOO Front page 4162.pdf
SOI Hydraulic Cartridge.pdf
S02 Rock Drill.pdf
S03 Drill Feed.pdf
S04 Boom.pdf
S05 Drilling Compartment.pdf
S06 Drilling Hydraulic Components.pd
S07 Tramming Compartment.pdf
S08 Diesel Power Pack.pdf
S09 Power Train.pdf
SIO Electric Power Packpdf
SII Electric Components.pdf
S12 Water Flushing Circuit.pdf
S13 Compressed Air Circuit.pdf
S14 Hydraulic Tank.pdf
S15 Carrier.pdf
S16 Safety Canopy.pdf
S17 Optional.pdf
S18 Hydraulic Hoses.pdf
S19 Special Equipments.pdf
CONTENTS
1 INTRODUCTION TO MACHINE 5
1/1 INTENDED TO USE 5
1/2 RECOMMENDED OPERATING CONDITIONS 5
1/3 COMPONENTS OF THE MACHINE 6
2 SAFETY & ENVIRONMENTAL INSTRUCTIONS 15
2/1 OPERATOR SAFETY INSTRUCTIONS 15
2/2 MAIN SAFETY HAZARDS IN USE OR MAINTENANCE WORK 16
2/3 ENVIRONMENTAL PRECAUTIONS 18
2/4 TYPE PLATE 19
2/5 GRADIENT ANGLE 19
2/6 MACHINE IN TRAMMING POSITION AND PARKING 20
2/7 DANGER AREAS 21
2/8 MANNERS AND CONDITIONS IN WHICH THE RIG SHOULD NOT BE USED 23
2/9 NOISE LEVEL AND NOISE EMISSION 23
2/10 ACCELERATION VALUE 23
2/11 SAFETY EQUIPMENT 24
2/12 FIRE PREVENTION 24
2/13 FIRE EXTINGUISHER (OPTIONAL) 25
2/14 EMERGENCY STOPS, MAIN SWITCHES AND EMERGENCY BRAKES 26
2/15 ELECTRIC CABLE 28
3 CHECKS AND INSTRUCTIONS 29
3/1 ASSEMBLY AND CHECKING OF A NEW MACHINE 29
3/2 ROUTINE CHECKS BEFORE STARTING A SHIFT 30
3/3 ELECTRIC PANEL 39
3/4 TRAMMING COMPARTMENT 40
3/5 BOOM MOVEMENTS 43
3/6 DRILLING COMPARTMENT 44
3/7 ROD MAGAZINE MOVEMENTS 52
4 (90) 7849 3824 – D-28-11-2006 SR-RB-FL
SOLO 5 – 5V
SANDVIK MINING AND CONSTRUCTION LYON S.A.S.
19, av. De Lattre de Tassigny
B.P. 46 – 69881 MEYZIEU cedex, FRANCE
Tel: +33 (0)4 72 45 22 00 Fax: +33 (0)4 78 31 79 80
4 TRAMMING 53
4/1 STARTING THE ENGINE 53
4/2 EMERGENCY/PARKING BRAKE TEST 56
4/3 ELECTRIC CABLE 57
4/4 MOVING THE MACHINE 58
4/5 PARKING THE MACHINE 59
5 DRILLING 60
5/1 SETTING-UP THE MACHINE IN THE DRIFT 60
5/2 ELECTRIC POWER 61
5/3 PARALLELISM SETTING 67
5/4 COLLARING A HOLE 68
5/5 NORMAL DRILLING 68
6 ADDING AND REMOVING RODS 70
6/1 LOOSING OF THE ROD THREADS 70
6/2 ADDINGS RODS 71
6/3 REMOVING RODS 72
7 TRANSPORTATION 73
7/1 TRANSPORTATION ON A PLATFORM 73
7/2 TOWING THE MACHINE 74
7/3 LIFTING THE MACHINE 75
7/4 STORING THE MACHINE 76
8 TECHNICAL DATA 77