A GMK 3050-1 is a three-axle all terrain crane. It drives to the job on public roads, then sets up and lifts with its telescopic boom. If a used crane came in without the book in the cab, this is the document an operator needs before taking the first lift.
What this manual helps you do
- Read the controls and instruments before you climb into the cab, including the crane cabin heating controls.
- Follow the basic safety instructions for crane operators.
- Plan the job using the information for operations planning.
- Set up and rig the crane, then run crane operation from the superstructure.
- Check the driving mode and rigging for on-road driving, and know what to do when a malfunction shows up in driving mode or during crane operation.
Who this is for
Operators and operator trainers get the most from it. An operator uses it to learn the carrier and superstructure controls and the setup sequence. A trainer uses it as the reference for walking a new or relief operator through the machine.
FAQ
Q: What do I receive and how is it organised?
A: You get the set: 2 PDF files, 1,214 pages in total, in English. The main manual is Publication 3 112 354 en (986 pages), and the second is Publication 3 112 411 (228 pages).
Q: Which machine does it fit?
A: It is written for the Grove GMK 3050-1 all terrain crane. The title on the main manual reads "GMK 3050-1 Operating Instructions Part 1".
Q: How does it fit my job?
A: An operator manual like this usually follows the work in order, and you'd expect to find the vehicle section, diesel engine, driving the truck crane, the crane section, rigging work and the technical information for the carrier and the superstructure. There is an index at the back to help you find a topic quickly.
Keep the set on file for the GMK 3050-1 and you have the operating rules, controls and setup steps ready for whoever takes the next shift.
Click here to view the preview (PDF)
📘 Show Index
Table of Contents:
- Publication 3 112 354 en (986 pages)
- Additional page Controls for crane cabin heating
- Position of controls
- Function
- Overview
- Vehicle identification
- EC Conformity Declaration
- Overview and contents of the truck crane user information
- Basic safety instructions for crane operators
- Warnings and symbols
- Intended use
- Organisational measures
- Information for operations planning
- Safety instructions
- Operations planning
- Description of the truck crane vehicle section
- Overview of the operating and display elements
- Functional description of the display and operating elements
- Other operating elements on the carrier
- Diesel engine
- Starting/turning off the diesel engine
- Shutting down the diesel engine
- Operation if equipped with dual tank
- Driving the truck crane
- Checks and adjustments before driving
- General operation
- Off-road driving
- Driving mode and rigging for on-road driving
- Driving modes
- Rigging work for driving with a trailer
- Malfunctions in driving mode
- Emergency stop device on carrier
- What to Do in the Event of a Breakdown in Road Traffic
- Towing the truck crane
- Technical Information on Carrier
- Technical description of the carrier
- Technical data
- Index
- Description of the crane section of thetruckcrane
- Overview of the operating and display instruments
- Functional description of the display and operatingelements
- Functional description of the safety devices
- Crane operation
- Checks and adjustments before crane operation
- Starting and stopping the diesel engine from thesuperstructure
- Operating the safe load indicator (SLI)
- Rigging work
- Checklists for rigging work for crane operation with main boom
- Choosing a suitable site
- Rigging work after driving with trailer
- Malfunctions during crane operation
- Emergency-stop devices for crane operation
- Procedure in the event of a malfunction during craneoperation
- Electrical system
- Technical information for superstructure
- Technical description of the superstructure
- Technical data
- Publication 3 112 411 (228 pages)
- Important information
- About these operating instructions
- Basic safety instructions
- Intended use
- Transport dimensions and weights
- Swing-away lattice extension
- Auxiliary single-sheave boom top
- Heavy load lattice extension
- 8.7/15 m swing-away latticeextension
- Validity
- Additional operating and display elements
- Identification of the swing-away lattice extension
- Auxiliary single-sheave boom top
- Identification
- Installing/removing auxiliary single-sheave boom top
- Rigging the auxiliary single-sheave boom top
- Heavy load lattice extension
- Identification
- Attaching and securing the heavy load lattice extension
- Installing/removing the heavy load lattice extension
- Index
Grove PDF Manuals
All Crane Manuals