$ 0
0
$ 0
0

Grove GMK 5095 All Terrain Crane Operator Manual

Format: PDF (Printable Document)

File Language: English, German

File Pages: 2,298

File Size: 107.56 MB (Speed Download Link)

File Count: 4 PDF files

Brand: Grove

Model: GMK 5095

Equipment Type: All Terrain Crane

Book No: 3 112 472

Manuals Included: 4 separate publications

Type of Document: Operator Manual

Searchable: Partly, some files are scanned pages without a text layer

Delivery: Instant download after payment

Categories: ,

$ 45

Share:

Grove GMK 5095 All Terrain Crane Operator Manual

The GMK 5095 is a five-axle all terrain crane. It drives to the job on public roads, then sets up and lifts with its telescopic boom. If a relief operator is taking over this crane, or a used one came in without the book in the cab, this is the manual that sits behind the seat.

What this manual helps you do

  • Learn the operating elements for driving and for crane operation before you climb in.
  • Follow the basic safety instructions for driving and for crane operation.
  • Plan rigging work and the steps for a rigged truck crane, driving.
  • Operate the crane through the crane operation section, including turning off the engine for crane operation.
  • Read the malfunction sections for driving mode and for crane operation, so you know what a warning is telling you.

Who this is for

An operator or relief operator taking over a GMK 5095 gets the control layout, the driving modes and the setup sequence in one place. An owner-operator or hire company keeps it on file so every driver works from the same rules.

FAQ

Q: What do I receive and how is it organised?

A: You get the set: 4 PDF files, 2,298 pages in total, in English and German. The main manual is Publication 3 112 472 (852 pages), alongside Publication 3 112 428 (838 pages), Publication 3 112 464 (310 pages) and Publication 3 112 466 (298 pages).

Q: Which machine does it fit?

A: It is for the Grove GMK 5095 all terrain crane. The main manual is titled GMK 5095 Operating Instructions.

Q: How does it fit my job?

A: Its sections run from the overview and basic safety instructions through driving, crane operation and rigging work, with technical information for the carrier and the superstructure and an index. That is the order you work in on a normal day.

Put the set on your tablet or print the pages you need, and the next operator has the book in hand on day one.

Click here to view the preview (PDF)

📘 Show Index

Table of Contents:

  • Publication 3 112 472 (852 pages)
    • Additional page Controls for crane cabin heating
      • Position of controls
      • Function
    • Overview
      • Identification
      • EC Declaration of Conformity
      • Documentation supplied
    • Basic safety instructions
      • Intended use
      • Organisational measures
      • Qualifications of the personnel
    • Operating elements for driving
      • Overview of the operating elements
      • Short description of the operating elements
    • turning off the engine for driving
      • Starting the engine from the driver's cab
      • Turning off the engine
      • Air intake inhibitor
    • Driving
      • Before driving
      • Operating the transmission
      • Driving and turning off the truck crane
    • Driving modes
      • Driving modes
      • Rigging work for driving with a trailer
    • Malfunctions in driving mode
      • Emergency stop switch
      • What to do when a malfunction occurs in road traffic
      • Towing the truck crane
    • Technical Information on Carrier
      • Technical data
    • Index
    • Operating elements for crane operation
      • Overview of the operating elements
      • Short description of the operating elements
      • Short description of the operating elements – driving from the crane cab
    • turning off the engine – for crane operation
      • Starting the engine – from the crane cab
      • Starting the engine – with the hand-held control
      • Turning off the engine
    • Crane operation
      • Before crane operation
      • Operation of the safe load indicator
      • Crane operation with main boom
    • Rigging work
      • Rigging work checklists for crane operation with the main boom
      • Choosing a suitable site
      • Rigging work after driving with a trailer
    • Rigged truck crane, driving
      • Route
      • Before driving the rigged truck crane
      • Permissible rigging modes and axle loads
    • Malfunctions during crane operation
      • Emergency stop switch
      • What to do when a malfunction occurs during crane operation
      • Fuses
    • Technical information for the superstructure
      • Technical data
  • Publication 3 112 428 (838 pages)
    • Additional page Controls for crane cabin heating
      • Position of controls
      • Function
    • Overview
      • Identification
      • EC Declaration of Conformity
      • Documentation supplied
    • Basic safety instructions
      • Intended use
      • Organisational measures
      • Qualifications of the personnel
    • Operating elements for driving
      • Overview of the operating elements
      • Short description of the operating elements
    • turning off the engine for driving
      • Starting the engine from the driver's cab
      • Turning off the engine
      • Air intake inhibitor
    • Driving
      • Before driving
      • Operating the transmission
      • Driving and turning off the truck crane
    • Driving modes
      • Driving modes
      • Rigging work for driving with a trailer
    • Malfunctions in driving mode
      • Emergency stop switch
      • What to do when a malfunction occurs in road traffic
      • Towing the truck crane
    • Technical Information on Carrier
      • Technical data
    • Index
    • Operating elements for crane operation
      • Overview of the operating elements
      • Short description of the operating elements
      • Short description of the operating elements – driving from the crane cab
    • turning off the engine – for crane operation
      • Starting the engine – from the crane cab
      • Starting the engine – with the hand-held control
      • Turning off the engine
    • Crane operation
      • Before crane operation
      • Operation of the safe load indicator
      • Crane operation with main boom
    • Rigging work
      • Rigging work checklists for crane operation with the main boom
      • Choosing a suitable site
      • Rigging work after driving with a trailer
    • Rigged truck crane, driving
      • Route
      • Before driving the rigged truck crane
      • Permissible rigging modes and axle loads
    • Malfunctions during crane operation
      • Emergency stop switch
      • What to do when a malfunction occurs during crane operation
      • Fuses
    • Technical information for the superstructure
      • Technical data
  • Publication 3 112 464 (310 pages)
  • Publication 3 112 466 (298 pages)
    • Additional pages: Centre of gravity of the swing-away lattice
      • Validity
      • Slinging
      • Swing-away lattice in lattice construction
    • Additional pages: Swing-away lattice in lattice construction
      • Validity
      • Transport dimensions and weights
      • Slinging points
    • Additional pages GMK 4100: Driving with a rigged crane
      • Validity
      • Reasons for the additional information
      • Additional information
    • Additional pages GMK 4100-L: Driving with a rigged crane
      • Validity
      • Reasons for the additional information
      • Additional information
    • Additional pages GMK 5095: Driving with a rigged crane
      • Validity
      • Reasons for the additional information
      • Additional information
    • Information
      • About these operating instructions
      • Basic safety instructions
      • Intended use
    • For operations planning
      • Swing-away lattice
      • Boom extension
      • Auxiliary single-sheave boom top
    • Swing-away lattice
      • Validity
      • Short description of the operating elements
      • Rigging work checklists
    • Boom extension
      • Rigging work checklists
      • Description of the rigging work
      • Operation with boom extension
    • Auxiliary single-sheave boom top
      • removal
      • Rigging the auxiliary single-sheave boom top
      • Operation with the auxiliary single-sheave boom top
    • Integrated heavy load lattice extension
      • Checklists for rigging work
      • Description of rigging work
      • Operation with ISS
    • Turning loads
      • Prerequisites
      • Setting the SLI
      • Turning a load
    • Driving with rigged crane
      • Safety instructions
      • Route
      • Rigging modes and axle loads
    • Maintenance
      • Cleaning work
      • Maintenance overview GMK 4100, GMK 4100-L
      • Maintenance overview GMK 5095
    • Index

Grove PDF Manuals

All Crane Manuals

Related Manuals

0
0
Your Cart
Your cart is emptyReturn to Shop