Description
Hitachi Sumitomo SCX2800-2 Technical and Workshop Manual
Hitachi Sumitomo SCX2800-2 Index:
SECTION 4 OPERATIONAL PERFORMANCE
TEST
Group 1 Introduction
Group 2 Standard
Group 3 Engine Test
Group 4 Crane Test
Group 5 Component Test
Group 6 Adjustment
SECTION 5 TROUBLESHOOTING
Group 1 Diagnosing Procedure
Group 2 Component Layout
Group 3 Troubleshooting A
Group 4 Troubleshooting B
Group 5 Troubleshooting C
Group 6 Troubleshooting D
Group 7 Troubleshooting E
Group 8 Electrical System Inspection
TECHNICAL MANUAL (Operational Principle)
SECTION 1 GENERAL
Group 1 Specifications
Group 2 Component Layout
Group 3 Component Specifications
SECTION 2 SYSTEM
Group 1 Control System
Group 2 Hydraulic System
Group 3 Electrical System
SECTION 3 COMPONENT OPERATION
Group 1 Pump Mechanism
Group 2 Slewing Mechanism
Group 3 Hoisting Mechanism
Group 4 Boom Derricking Mechanism
Group 5 Front / Back Control Valve
Group 6 Sleming Control Valve
Group 7 Lower Control Valve
Group 8 Remote Control Valve
Group 9 Solenoid Valve Unit
Group 10 Travel Mechanism
Group 11 Others (Upper Structure)
Group 12 Others (Base Carrier)
WORKSHOP MANUAL
SECTION 1 GENERAL INFORMATION
Group 1 Precautions for Disassembling
and Assembling
Group 2 Tightening Torque
SECTION 2 UPPER STRUCTURE
Group 1 Cab
Group 2 Counterweight
Group 3 Slewing Frame
Group 4 Pump Mechanism
Group 5 Control Valve
Group 6 Slewing Mechanism
Group 7 Hoisting Mechanism
Group 8 Derricking Mechanism
Group 9 Remote Control Valve
Group 10 Solenoid Valve
Group 11 Cylinder
SECTION 3 BASE CARRIER
Group 1 Slewing Ring
Group 2 Travel Mechanism
Group 3 Center Joint
Group 4 Take-up Tumbler
Group 5 Upper and Lower Roller
Group 6 Crawler Shoe
Group 7 Cylinder
Group 8 Control Valve