$ 0
0
$ 0
0

Komatsu BR480RG-1 Crusher Operation and Maintenance Manual (SEAM047100T)

Format: PDF (Printable Document)

File Language: English

File Pages: 330

File Size: 11.33 MB (Speed Download Link)

Brand: Komatsu

Model: BR480RG-1 Crusher

Book No: SEAM047100T

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu BR480RG-1 Crusher Operation and Maintenance Manual (SEAM047100T)

Komatsu BR480RG-1 Crusher Operation and Maintenance Manual (SEAM047100T)

📘 Show Index

Komatsu BR480RG-1 Crusher Index:

  • COVER
  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
    • INTRODUCTION
      • FRONT/REAR,LEFT/RIGHT DIRECTIONS OF MAHCINE
    • NECESSARY INFORMATION
      • MACHINE SERIAL NO. PLATE AND POSITION
      • ENGINE SERIAL NO. PLATE AND POSITION
      • POSITION OF SERVICE METER
      • TABLE OF ENTER SERIAL NO. AND DISTRIBUTOR
  • CONTENTS
  • SAFETY
    • SAFETY
    • SAFETY LABELS
      • POSITIONS OF SAFETY PICTOGRAMS
      • SAFETY LABELS
    • GENERAL PRECAUTIONS
      • SAFETY RULES
      • IF ABNORMALITIES ARE FOUND
      • CLOTHING AND PERSONAL PROTECTIVE ITEMS
      • FIRE EXTINGUISHER AND FIRST AID KIT
      • SAFETY FEATURES
      • KEEP MACHINE CLEAN
      • PRECAUTIONS TO BE FOLLOWED IN UPPER OPERATION DECK
      • ALWAYS APPLY LOCK WHEN LEAVING OPERATOR’S PLATFROM
      • HANDRAILS AND STEPS
      • MOUNTING AND DISMOUNTING
      • NO PEOPLE ON ATTACHMENTS
      • CRUSHING OR CUTTING PREVENTION
      • PREVENTION OF BURNS
      • FIRE PREVENTION
      • ACTION IF FIRE OCCURS
      • PRECAUTIONS FOR ATTACHMENTS
      • UNAUTHORIZED MODIFICATION
      • SAFETY AT WORKSITE
      • WORKING ON LOOSE GROUND
      • DO NOT GO CLOSE TO HIGH-VOLTAGE CABLES
      • ENSURE GOOD VISIBILITY
      • VENTILATION FOR ENCLOSED AREAS
      • CHECKING SIGNALMAN’S SIGNALS AND SIGNS
      • BE CAREFUR ABOUT ASBESTOS DUST
    • PRECAUTIONS FOR OPERATION
      • STARTING ENGINE
      • OPERATION
      • CRUSHING OPERATION
      • TRANSPORTATION
      • BATTERY
      • TOWING
    • PRECAUTIONS FOR MAINTENANCE
      • WARNING TAG
      • KEEP WORK PLACE CLEAN AND TIDY
      • APPOINT LEADER WHEN WORKING WITH OTHERS
      • STOP ENGINE BEFORE CARRYING OUT INSPECTION AND MAINTENANCE
      • TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
      • PRECAUTIONS FOR CONVEYOR MAINTENANCE
      • PROPER TOOLS
      • PERSONNEL
      • PRECAUTIONS WHEN MOUNTING,DISMANTLING AND STORING ATTACHMENTS
      • PRECAUTIONS FOR WORK UNDER MACHINE
      • NOISE
      • PRECAUTIONS WHEN USING HAMMER
      • REPAIR WELDING
      • REMOVING BATTERY TERMINAL
      • PRECAUTIONS WHEN USING HIGH-PRESSURE GREASE TO ADJUST TRACK TENSION
      • DO NOT DISASSEMBLE RECOIL SPRING
      • PRECAUTIONS WITH HIGH-PRESSURE OIL
      • HANDLING HIGH-PRESSURE HOSES
      • WASTE MATERIAL
      • COMPRESSED AIR
      • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • OPERATION
    • GENERAL VIEW
      • GENERAL VIEW OF MACHINE
      • GENERAL VIEW OF IMPACT CRUSHER
      • GENERAL VIEW OF CONTROLS AND GAUGES
    • EXPLANATION OF COMPONENTS
      • MACHINE MONITOR
      • SWITCHES
      • CONTROL LEVERS
      • CAP,COVER WITH LOCK
      • REVOLVING WARNING LAMP
      • ADDITIONAL WORKING LAMP
      • FUSIBLELINK
      • CONTROLLERS
      • FUSE
    • OPERATION
      • CHECK BEFORE STARTING ENGINE
      • STARTING ENGINE
      • OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • STOPPING ENGINE
      • CHECK AFTER STOPPING ENGINE
      • MACHINE OPERATION
      • STEERING MACHINE
      • OPERATION OF WORK EQUIPMENT
      • WATER SPRINKLER
      • HYDRAULIC TYPE MAGNETIC SELECTOR
      • CHECK AND CONFIRMATION OF IMPACT CRUSHER AFTER WORK
      • CHECK AFTER FINISHING WORK
      • LOCKING
      • PRECAUTIONS WHEN OPERATING IMPACT CRUSHER
      • EFFICIENT USE OF IMPACT CRUSHER
      • SCOPE OF WORKS USING MOBILE CRUSHER
      • PROHIBITIONS FOR OPERATION
      • PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • LOADING,UNLOADING WORK
      • LIFTING MACHINE
    • COLD WEATHER OPERATION
      • PRECAUTIONS FOR LOW TEMPERATURE
      • AFTER COMPLETION OF WORK
      • AFTER COLD WEATHER
    • LONG-TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STRTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLESHOOTING
      • PHENOMENA THAT ARE NOT FAILURES
      • METHOD OF TOWING MACHINE
      • IF BATTERY IS DISCHARGED
      • OTHER TROUBLE
  • MAINTENANCE
    • GUIDE TO MAINTENANCE
    • OUTLINE OF SERVICE
      • HANDLING OIL,FUEL,COOLANT,AND PERFORMING OIL CLINIC
      • RELATING TO ELECTRIC SYSTEM
      • OUTLINE OF HYDRAULIC EQUIPMENT
    • WEAR PARTS
      • WEAR PARTS LIST
      • IMPACT CRUSHER RELATED PARTS
      • PRIMARY BELT CONVEYOR RELATED PARTS
      • DEBRIS DISCHARGING BELT CONVEYOR RELATED PARTS
    • USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • TORQUE LIST
    • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS
    • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE SCHEDULE CHART
    • SERVICE PROCEDURE
      • INITIAL 250 HOURS MAINTENANCE(ONLY AFTER THE FIRST 250 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 100 HOURS SERVICE
      • EVERY 250 HOURS SERVICE
      • EVERY 500 HOURS SERVICE
      • EVERY 1000 HOURS SERVICE
      • EVERY 2000 HOURS SERVICE
      • EVERY 4000 HOURS SERVICE
      • EVERY 5000 HOURS SERVICE
  • SPECIFICATIONS
    • SPECIFICATIONS
  • ATTACHMENTS,OPTIONS
    • GENERAL PRECAUTIONS
      • PRECAUTIONS RELATED TO SAFETY
    • SPRINKLER
      • EXPLANATIONS FOR COMPONENT PARTS
      • HOW TO USE SPRINKLER
      • INSPECTION AND MAINTENANCE
    • RADIO CONTROL UNIT
      • DIRECTIONS FOR USE
      • OVERVIEW
      • ON USE OF RADIO CONTROL UNIT
  • INDEX
  • COVER
  • TABLE OF CONTENTS
  • PART Ⅰ INTRODUCTION
    • 1. FOREWORD
  • PART ⅡSAFETY
    • 1. SAFETY INFORMATION
    • 2. QUALIFICATION FOR OPERATING THE MACHINE
      • 2.1 QUALIFICATION REQUIREED FOR OPERATING CRANES
    • 3. BASIC RULES
    • 4. RULES FOR OPERATION
      • 4.1 BEFORE SATRTING UP ENGINE
      • 4.2 AFTER THE ENGINE HAS STARTED
      • 4.3 DURING CRANE OPERATION
    • 5. RULES FOR HANDLING THE BATTERY
    • 6. RULES TO OBSERVE IN CONNECTION WITH SERVICE
      • 6.1 BEFORE STARTING THE SERVICE WORK
      • 6.2 DURING SERVICE WORK
    • 7. LOCATION FOR AFFIXING CAUTION PLATES
    • 8. CAUTION PLATES AND OPERATION MANUAL ORDERING PROCEDURES
  • PART Ⅲ OPERATION
    • 1. NOMENCLATURE OF COMPONENTS
    • 2. CRANE OVERVIEW
      • 2.1 KEY SPECIFICATIONS
      • 2.2 GLOSSARY
      • 2.3 HOW TO READ WORKING RADIUS AND LIFTING HEIGHT DIAGRAM
      • 2.4 HOW TO READ TOTAL RATED LOAD CHART(DS100C-MC053)
      • 2.5 HOW TO READ LOAD INDICATOR AND MOMENT METER
      • 2.6 HOOK OVER-HOIST PREVENTIVE DEVICE
    • 3. CRANE OPERATION PROCEDURE(FROM REMOTE CONTROL SWITCHES)
      • 3.1 NOMENCLATURE OF COMPONENTS ON REMOTE CONTROL DEVICE
      • 3.2 NOMENCLATURE OF COMPONENTS ON CONTROL CASE
      • 3.3 PREPARATIONS FOR OPERATION
      • 3.4 USING THE REMOTE CONTROL SWITCHES
      • 3.5 ENDING THE CRANE OPERATION
    • 4. PRECAUTIONS ON USE OF REMOTE CONTROL SWITHCES
      • 4.1 BEFORE STARTING THE OPERATION
      • 4.2 DURING THE OPERATION
      • 4.3 AFTER THE OPERATION
      • 4.4 OTHERS
    • 5. REMOTE CONTROL DEVICE CHECK POINTS
      • 5.1 TROUBLESHOOTING GUIDE-WHEN THE CRANE IS INOPERABLE FROM THE REMOTE CONTROL DEVICE
    • 6. PRECAUTIONS ON USE
      • 6.1 BEFORE STARTING THE OPERATION
      • 6.2 HANDLING OF TARGET CARGO OF LIFT
      • 6.3 HANDLING OF WIRE ROPE
      • 6.4 AFTER USING THE CRANE
      • 6.5 OTHERS
    • 7. CHECK ITEMS
      • 7.1 INSPECTION OF THE SWING BEARING MOUNTING BOLT
    • 8. WIRE ROPE REPLACEMENT PROCEDURE
      • 8.1 PRECAUTIONS ON HANDLING WIRE ROPES
      • 8.2 WIRE ROPE REPLACEMENT PROCEDURE
    • 9. BOOM TELESCOPING WIRE ROPE ADJUSTING PROCEDURE
      • 9.1 ADJUSTING PROCEDURE
    • 10. REPLACEMENT OF DRY CELL ON THE OVER-HOIST PREVENTIVE DEVICE
    • 11. HYDRAULIC OIL
    • 12. LUBRICATING OIL
      • 12.1 LUBRICATING POINTS
      • 12.2 CHECK AND REFILLING OF LUBRICATING OIL ON THE SWING GEARBOX
      • 12.3 LUBRICATING POINTS,LUBRICATING OILS USED AND LUBRICATION INTERVALS
    • 13. REPLACEMENT OF CONSUMABLE PARTS
    • 14. DESCRIPTION OF THE DEVICES EMPLOYED FOR THE CRANE
      • 14.1 ALARM SWITCH
      • 14.2 OVER-HOIST PREVENTIVE DEVICE
      • 14.3 LOAD INDICATOR
      • 14.4 MOMENT METER
      • 14.5 AUTOMATIC OIL PRESSURE LOCK DEVICE

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop