$ 0
0
$ 0
0

Komatsu BR550JG-1 Crusher Operation and Maintenance Manual (EEAM020902)

Format: PDF (Printable Document)

File Language: English

File Pages: 282

File Size: 7.88 MB (Speed Download Link)

Brand: Komatsu

Model: BR550JG-1 Crusher

Book No: EEAM020902

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu BR550JG-1 Crusher Operation and Maintenance Manual (EEAM020902)

Komatsu BR550JG-1 Crusher Operation and Maintenance Manual (EEAM020902)

📘 Show Index

Komatsu BR550JG-1 Crusher Index:

  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
    • INTRODUCTION
      • FRONT/REAR,LEFT/RIGHT DIRECTIONS OF MACHINE
    • NECESSARY INFORMATION
      • MACHINE SERIAL NO. PLATE AND POSITION
      • ENGINE SERIAL NO. PLATE AND POSITION
      • POSITION OF SERVICE METER
      • TABLE OF ENTER SERIAL NO. AND DISTRIBUTOR
      • CONTENTS
      • FOREWORD
      • SAFETY
      • OPERATION
      • MAINTENANCE
      • SPECIFICATIONS
      • ATTACHMENTS, OPTIONS
  • SAFETY
    • SAFETY LABELS
      • POSITIONS OF SAFETY PICTOGRAMS
      • SAFETY LABELS
    • GENERAL PRECAUTIONS
    • PRECAUTIONS FOR OPERATION
      • STARTING ENGINE
      • OPERATION
      • CRUSHING OPERATION
      • TRANSPORTATION
      • BATTERY
      • TOWING
    • PRECAUTIONS FOR MAINTENANCE
  • OPERATION
    • GENERAL VIEW
      • GENERAL VIEW OF MACHINE
      • GENERAL VIEW OF CONTROLS AND GAUGES
    • EXPLANATION OF COMPONENTS
      • MACHINE MONITOR
      • SWITCHES
      • CONTROL LEVERS
      • OPTION-RELATED SWITCHES
      • CAP, COVER WITH LOCK
      • REVOLVING WORKING LAMP
      • ADDITIONAL WORKING LAMP
      • FUSIBLELINK
      • CONTROLLERS
      • FUSE
      • TOOL BOX
    • OPERATION
      • CHECK BEFORE STARTING ENGINE
      • STARTING ENGINE
      • OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • STOPPING ENGINE
      • CHECK AFTER STOPPING ENGINE
      • MACHINE OPERATION
      • STEERING MACHINE
      • OPERATION OF WORK EQUIPMENT
      • WATER SPRINKLER
      • OPENING-CLOSING TYPE HOPPER
      • CHECK AND CONFIRMATION OF JAW CRUSHER AFTER WORK
      • CHECK AFTER FINISHING WORK
      • LOCKING
      • RUN-IN OPERATION OF JAW CRUSHER
      • PRECAUTIONS WHEN OPERATING JAW CRUSHER
      • EFFICIENT USE OF JAW CRUSHER
      • SCOPE OF WORKS USING MOBILE CRUSHER
      • PROHIBITIONS FOR OPERATION
      • PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • PROCEDURE FOR DISASSEMBLY AND FOLDING
      • LOADING, UNLOADING WORK
      • LIFTING MACHINE
    • COLD WEATHER OPERATION
      • PRECAUTIONS FOR LOW TEMPERATURE
      • AFTER COMPLETION OF WORK
      • AFTER COLD WEATHER
    • LONG-TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STRTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLESHOOTING
      • PHENOMENA THAT ARE NOT FAILURES
      • METHOD OF TOWING MACHINE
      • IF BATTERY IS DISCHARGED
      • OTHER TROUBLE
  • MAINTENANCE
    • GUIDE TO MAINTENANCE
    • OUTLINE OF SERVICE
      • HANDLING OIL, FUEL, COOLANT,AND PERFORMING OIL CLINIC
      • RELATING TO ELECTRIC SYSTEM
      • OUTLINE OF HYDRAULIC EQUIPMENT
      • AIR-BLEEDING FROM HYDRAULIC CIRCUIT
    • WEAR PARTS
      • WEAR PARTS LIST
      • JAW CRUSHER RELATED PARTS
      • PRIMARY BELT CONVEYOR RELATED PARTS
    • USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • CRUSHER ACCESSORY TOOLS
      • TORQUE LIST
    • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS
    • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE SCHEDULE CHART
    • SERVICE PROCEDURE
      • INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 100 HOURS SERVICE
      • EVERY 250 HOURS SERVICE
      • EVERY 500 HOURS SERVICE
      • EVERY 1000 HOURS SERVICE
      • EVERY 2000 HOURS SERVICE
      • EVERY 4000 HOURS SERVICE
      • EVERY 5000 HOURS SERVICE
  • SPECIFICATIONS
    • SPECIFICATIONS
  • ATTACHMENTS, OPTIONS
    • GENERAL PRECAUTIONS
      • PRECAUTIONS RELATED TO SAFETY
    • HYDRAULIC TYPE MAGNETIC SELECTOR
      • SAFETY PRECAUTIONS
      • PROCEDURES FOR CONNECTION WITH CRUSHER
      • PRECAUTIONS IN USE
      • CHECK AND INSPECTION
      • FAILURES AND CORRECTIVE ACTIONS
      • LIST OF CHECKPOINT
      • SPECIFICATIONS
      • LIST OF WEARING PARTS
    • DEBRIS DISCHARGING CONVEYOR
      • LIFTING PROCEDURES
      • ASSEMBLING PROCEDURES
      • PROCEDURES FOR FOLDING DEBRIS DISCHARGING CONVEYOR
      • GREASING DEBRIS DISCHARGING CONVEYOR
      • CHECK AND ADJUSTMENT OF DEBRIS DISCHARGING CONVEYOR
      • FAILURES AND CORRECTIVE ACTIONS
      • WEARING PARTS
      • SPECIFICATIONS
    • RADIO CONTROL UNIT
      • DIRECTIONS FOR USE
      • OVERVIEW
      • ON USE OF RADIO CONTROL UNIT
    • BELT CONVEYOR PROTECTIVE PLATE
    • PROCEDURES FOR CONNECTING OPTIONAL ATTACHMENTS
      • LOCATION OF PORTS FOR CONNECTING OPTIONAL ATTACHMENTS
      • PROCEDURES FOR CONNECTING OPTIONAL ATTACHMENTS

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop