$ 0
0
$ 0
0

Komatsu BZ210-1 Mobile Soil Recycler Operation and Maintenance Manual (SEAM048202T)

Format: PDF (Printable Document)

File Language: English

File Pages: 417

File Size: 61.12 MB (Speed Download Link)

Brand: Komatsu

Model: BZ210-1 Mobile Soil Recycler

Book No: SEAM048202T

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu BZ210-1 Mobile Soil Recycler Operation and Maintenance Manual (SEAM048202T)

Komatsu BZ210-1 Mobile Soil Recycler Operation and Maintenance Manual (SEAM048202T)

📘 Show Index

Komatsu BZ210-1 Mobile Soil Recycler Index:

  • COVER
  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
    • INTRODUCTION
      • FRONT/REAR,LEFT/RIGHT DIRECTIONS OF MACHINE
    • NECESSARY INFORMATION
      • MACHINE SERIAL NO.PLATE AND POSITION
      • ENGINE SERIAL NO.PLATE AND POSITION
      • POSITION OF SERVICE METER
      • TABLE OF ENTER SERIAL NO.AND DISTRIBUTOR
  • CONTENTS
  • SAFETY
    • SAFETY
    • SAFETY LABELS
      • POSITION OF SAFETY PICTOGRAMS
      • SAFETY LABELS
    • GENERAL PRECAUTIONS
      • SAFETY RULES
      • IF ABNORMALITIES ARE FOUND
      • CLOTHING AND PERSONAL PROTECTIVE ITEMS
      • FIRE EXTINGUISHER AND FIRST AID KIT
      • SAFETY FEATURES
      • KEEP MACHINE CLEAN
      • PRECAUTIONS TO BE FOLLOWED IN UPPER OPERATION PLATFORM
      • ALWAYS APPLY LOCK WHEN LEAVING OPERATOR’S PLATFROM
      • HANDRAILS AND STEPS
      • MOUNTING AND DISMOUNTING
      • CRUSHING OR CUTTING PREVENTION
      • PREVENTION OF BURNS
      • FIRE PREVENTION
      • ACTION IF FIRE OCCURS
      • PRECAUTIONS FOR ATTACHMENTS
      • UNAUTHORIZED MODIFICATION
      • SAFETY AT WORKSITE
      • WORKING ON LOOSE GROUND
      • DO NOT GO CLOSE TO HIGH-VOLTAGE CABLES
      • ENSURE GOOD VISIBILITY
      • VENTILATION FOR ENCLOSED AREAS
      • CHECKING SIGNALMAN’S SIGNALS AND SIGNS
      • BE CAREFUR ABOUT ASBESTOS DUST
    • PRECAUTIONS FOR OPERATION
      • STARTING ENGINE
      • OPERATION
      • PRECAUTIONS FOR SOIL IMPROVING WORK
      • TRANSPORTATION
      • BATTERY
      • TOWING
    • PRECAUTIONS FOR MAINTENANCE
      • WARNING TAG
      • KEEP WORK PLACE CLEAN AND TIDY
      • APPOINT LEADER WHEN WORKING WITH OTHERS
      • STOP ENGINE BEFORE CARRYING OUT INSPECTION AND MAINTENANCE
      • TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
      • PRECAUTIONS FOR CONVEYOR MAINTENANCE
      • PROPER TOOLS
      • PERSONNEL
      • PRECAUTIONS WHEN MOUNTING,DISMANTLING AND STORING ATTACHMENTS
      • PRECAUTIONS FOR WORK UNDER MACHINE
      • NOISE
      • PRECAUTIONS WHEN USING HAMMER
      • REPAIR WELDING
      • REMOVING BATTERY TERMINAL
      • PRECAUTIONS WHEN USING HIGH-PRESSURE GREASE TO ADJUST TRACK TENSION
      • DO NOT DISASSEMBLE RECOIL SPRING
      • PRECAUTIONS WITH HIGH-PRESSURE OIL
      • HANDLING HIGH-PRESSURE HOSES
      • WASTE MATERIAL
      • COMPRESSED AIR
      • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • OPERATION
    • GENERAL VIEW
      • GENERAL VIEW OF MACHINE
      • CONTROL PANEL
    • EXPLANATION OF COMPONENTS
      • MONITOR DISPLAY PORTION
      • MACHINE MONITOR
      • SWITCHES AND DIALS
      • SWITCHES
      • CONTROL LEVERS
      • CAP,COVER WITH LOCK
      • REVOLVING WARNING LAMP
      • ADDITIONAL WORKING LAMP
      • FUSIBLELINK
      • FUSE
      • CONTROLLERS
      • RADIO CONTROL UNIT
      • MANUAL BOX
      • GREASE GUN HOLDER
    • OPERATION
      • SETTING UP MACHINE
      • CHECK BEFORE STARTING ENGINE
      • STARTING ENGINE
      • OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • STOPPING ENGINE
      • CHECK AFTER STOPPING ENGINE
      • MACHINE OPERATION
      • STEERING MACHINE
      • PREPARATIONS BEFORE STARTING MIXING WORK
      • PREPARATIONS FOR CRANE WORK
      • FEEDING SOLIDIFYING MATERIALS
      • MIXING WORK
      • HOW TO CHECK SET CONDITIONS
      • EMERGENCY STOP
      • PROHIBITIONS FOR OPERATION
      • GENERAL OPERATION INFORMATION
      • PRECAUTIONS WHEN TRAVELING UP OR DOWNHILLS
      • SAFETY FUNCTIONS
      • FINISHING MIXING WORK
      • CLEANING AFTER FINISHING WORK
      • CHECK AFTER FINISHING WORK
      • LOCKING
      • DETAILED EXPLANATIONS ON CHARACTERISTICS OF FIXED RATE FEED RAW MATERIAL AND SOLIDIFYING MATERIAL
      • FOR SOIL IMPROVING WORK BASED ON MORE PRECISE FEED RATIO
      • CALIBRATION METHOD BY CALIBRATION SWITCH
      • CALIBRATION OF RAW MATERIAL
      • WHEN NOT USING SOIL CUTTER
      • SETTING USE OR NO USE OF SOIL CUTTER
      • SETTING BATCH PROCESSING
      • SETTING USE OR DO NOT USE OF ECO ACCELERATOR
      • SOLIDIFYING MATERIAL(IN FLEXIBLE CONTAINER BAG)FEED METHOD USING SEMI-AUTO POSITIONING FUNCTION
      • SCRAPING ROTOR’S FUNCTION OF REVERSE ROTATION
      • WHEN YOU DO NOT WANT TO USE SOLIDIFYING MATERIAL
      • DISPLAY OR DO NOT DISPLAY OF CUMULATIVE VALUES
      • SETTING DETECTION PRESSURE FOR SOIL CUTTER’S AUTO SPEED CHANGE
      • WHEN A CHANGE OF SETTING IS REQUIRED
      • WHEN MACHINE’S FIRM POWER IS SHUT OFF
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • TRANSPORTATION OF SOLIDIFYING MATERIAL HOPPER
      • LOADING,UNLOADING WORK
      • LIFTING MACHINE
      • MACHINES OF STANDARD SPECIFICATIONS
      • REMOVING PARTS FOR TRANSPORTATION AND INSTALLING AGAIN
    • COLD WEATHER OPERATION
      • PRECAUTIONS FOR LOW TEMPERATURE
      • AFTER COMPLETION OF WORK
      • AFTER COLD WEATHER
    • LONG-TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
    • TROUBLESHOOTING
      • AFTER RUNNING OUT OF FUEL
      • PHENOMENA THAT ARE NOT FAILURES
      • METHOD OF TOWING MACHINE
      • LIGHTWEIGHT TOWING HOOK
      • IF BATTERY IS DISCHARGED
      • OTHER TROUBLE
      • TABLE FOR JUDGING OVERLOAD AND RESULTANT MOTION OF WORK EQUIPMENT
      • TABLE FOR FUNCTION OF MONITOR LAMPS
  • MAINTENANCE
    • GUIDE TO MAINTENANCE
    • OUTLINE OF SERVICE
      • HANDLING OIL,FUEL,COOLANT,AND PERFORMING OIL CLINIC
      • RELATING TO ELECTRIC SYSTEM
      • OUTLINE OF HYDRAULIC EQUIPMENT
      • AIR-BLEEDING FROM HYDRAULIC CIRCUIT
    • WEAR PARTS
      • WEAR PARTS LIST
      • ROTARY HAMMER AND SOIL CUTTER
      • LINING INSIDE MIXER
      • DISCHARGE BELT CONVEYOR
    • USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
      • PROPER SELECTION OF FUEL,COOLANT AND LUBRICANTS
    • STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • TORQUE LIST
    • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS
    • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE SCHEDULE CHART
    • SERVICE PROCEDURE
      • INITIAL 250 HOURS MAINTENANCE(ONLY AFTER THE FIRST 250 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 100 HOURS SERVICE
      • EVERY 250 HOURS SERVICE
      • EVERY 500 HOURS SERVICE
      • EVERY 1000 HOURS SERVICE
      • EVERY 2000 HOURS SERVICE
      • EVERY 4000 HOURS SERVICE
      • EVERY 5000 HOURS SERVICE
  • SPECIFICATIONS
    • SPECIFICATIONS
  • ATTACHMENTS,OPTIONS
    • GENERAL PRECAUTIONS
      • PRECAUTIONS RELATED TO SAFETY
  • INDEX
  • COVER
  • TABLE OF CONTENTS
  • PART Ⅰ INTRODUCTION
    • 1. FOREWORD
    • 2. OUTLINE OF THIS CRANE
    • 3. SLINGING PERFORMANCE
  • PART Ⅱ SAFETY
    • 1. SAFETY INFORMATION
    • 2. QUALIFICATION FOR OPERATING THE MACHINE
    • 3. BASIC RULES
    • 4. RULES FOR OPERATION
    • 5. RULES FOR HANDLING THE BATTERY
    • 6. RULES TO OBSERVE IN CONNECTION WITH SERVICE
    • 7. LOCATION OF SAFETY LABELS
    • 8. ORDERING SAFETY LABEL AND OPERATION AND MAINTENANCE MANUAL
  • PART Ⅲ OPERATION
    • 1. RIGHT OPERATION METHOD
    • 2. NAME OF EACH PART AND COMPONENT
    • 3. EXPLANATIONS ON FUNCTION OF CRANE CONTROL UNIT
    • 4. STARTUP INSPECTION
    • 5. PREPARATIONS BEFORE STARTING WORK USING CRANE
    • 6. HOW TO OPERATE CRANE
    • 7. WHEN TERMINATING WORK USING CRANE
    • 8. HANDLING OF WIRE ROPE
  • PART Ⅳ INSPECTION AND MAINTENANCE SERVICE
    • 1. LEGALLY REQUIRED INSPECTION
    • 2. BASIC MAINTENANCE POINTS
    • 3. CONSUMABLE PARTS
    • 4. STANDARD TIGHTENING TORQUE
    • 5. PERIODIC INSPECTION AND MAINTENANCE
  • PART Ⅴ SPECIFICATIONS
    • 1. SPECIFICATIONS
  • COVER
  • CONTENTS
  • 1. NOMENCLATURE OF VARIOUS PARTS
    • 1.1 TRANSMITTER
    • 1.2 RECEIVER
    • 1.3 SAFETY SYSTEMS
  • 2. TRANSMITTER OPERATION
    • 2.1 OPERATION IN CRANE MODE
    • 2.2 AUTOMATIC HOOK STOWING
  • 3. NOMENCLATURE
    • 3.1 ALARM SYSTEM
    • 3.2 ENGINE STOP/EMERGENCY STOP
    • 3.3 STARTING AND RESETTING THE ENGINE
  • 4. OPERATION
    • 4.1 MATTERS TO BE CHECKED BEFORE STARTING OPERATION
    • 4.2 STARTING THE RADIO REMOTE CONTROL SYSTEM
    • 4.3 CRANE OPERATION
    • 4.4 COMPLETING YOUR CRANE OPERATION
  • 5. TROUBLE SHOOTING
    • 5.1 MATTERS TO BE CHECKED WHEN CRANE DOSE NOT OPERATE DESPITE THAT THE ENGINE RUNNING
    • 5.2 TROUBLE IN RADIO CONTROLLER
  • 6. OUTER DIMENSIONS

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop