$ 0
0
$ 0
0

Komatsu PC1000-1, PC1000LC-1, PC1000SE-1 Hydraulic Excavator Operation and Maintenance Manual (SEAM007700)

Format: PDF (Printable Document)

File Language: English

File Pages: 259

File Size: 7.31 MB (Speed Download Link)

Brand: Komatsu

Model: PC1000-1, PC1000LC-1, PC1000SE-1 Hydraulic Excavator

Book No: SEAM007700

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC1000-1, PC1000LC-1, PC1000SE-1 Hydraulic Excavator Operation and Maintenance Manual (SEAM007700)

Komatsu PC1000-1, PC1000LC-1, PC1000SE-1 Hydraulic Excavator Operation and Maintenance Manual (SEAM007700)

📘 Show Index

Komatsu PC1000-1, PC1000LC-1, PC1000SE-1 Hydraulic Excavator Index:

  • COVER
  • 1.FOREWORD
  • 2.SAFETY INFORMATION
  • 3.INTRODUCTION
  • 4.LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 5.CONTENTS
  • SAFETY
    • 6.GENERAL PRECAUTIONS
    • 7.PRECAUTIONS DURING OPERATION
      • 7.1 BEFORE STARTING ENGINE
      • 7.2 OPERATING MACHINE
      • 7.3 TRANSPORTATION
      • 7.4 BATTERY
      • 7.5 BUCKET WITH HOOK
    • 8.PRECAUTIONS FOR MAINTENANCE
      • 8.1 BEFORE CARRYING OUT MAINTENANCE
      • 8.2 DURING MAINTENANCE
    • 9.POSITION FOR ATTACHING SAFETY LABELS
  • OPERATION
    • 10.GENERAL VIEW
      • 10.1 GENERAL VIEW OF MACHINE
      • 10.2 GENERAL VIEW OF CONTROLS AND GAUGES
    • 11.EXPLANATION OF COMPONENTS
      • 11.1 MACHINE MONITOR
      • 11.2 LAMP
      • 11.3 SWITCHES
      • 11.4 CONTROL LEVERS, PEDALS
      • 11.5 CEILING WINDOW
      • 11.6 FRONT WINDOW
      • 11.7 DOOR LOCK
      • 11.8 DUST INDICATOR
      • 11.9 AIR CONDITIONER
      • 11.10 RADIO
      • 11.11 FUSE
      • 11.12 CONTROLLERS
      • 11.13 TOOL BOX
      • 11.14 GREASE PUMP
      • 11.15 HANDLING GREASE PUMP
      • 11.16 HANDLING ACCUMULATOR
    • 12.OPERATION
      • 12.1 CHECK BEFORE STARTING ENGINE
      • 12.2 STARTING ENGINE
      • 12.3 OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • 12.4 MOVING MACHINE OFF
      • 12.5 STEERING MACHINE
      • 12.6 STOPPING MACHINE
      • 12.7 SWINGING
      • 12.8 OPERATION OF WORK EQUIPMENT
      • 12.9 WORKING MODE SELECTION
      • 12.10 PROHIBITIONS FOR OPERATION
      • 12.11 PRECAUTIONS FOR OPERATION
      • 12.12 PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
      • 12.13 HOW TO ESCAPE FROM MUD
      • 12.14 WORK POSSIBLE USING HYDRAULIC EXCAVATOR
      • 12.15 PARKING MACHINE
      • 12.16 CHECK AFTER FINISHING WORK
      • 12.17 STOPPING ENGINE
      • 12.18 CHECK AFTER STOPPING ENGINE
      • 12.19 LOCKING
    • 13.TRANSPORTATION
      • 13.1 PRECAUTIONS FOR TRANSPORTATION
      • 13.2 PARTS FOR TRANSPORT
      • 13.3 PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE
    • 14.COLD WEATHER OPERATION
      • 14.1 PRECAUTIONS FOR LOW TEMPERATURE
      • 14.2 PRECAUTIONS AFTER COMPLETION OF WORK
      • 14.3 AFTER COLD WEATHER
    • 15.LONG-TERM STORAGE
      • 15.1 BEFORE STORAGE
      • 15.2 DURING STORAGE
      • 15.3 AFTER STORAGE
      • 15.4 STARTING MACHINE AFTER LONG-TERM STORAGE
    • 16.TROUBLESHOOTING
      • 16.1 PHENOMENA THAT ARE NOT FAILURES
      • 16.2 PRECAUTIONS ON PARTICULAR JOBSITES
      • 16.3 IF BATTERY IS DISCHARGED
      • 16.4 OTHER TROUBLE
  • MAINTENANCE
    • 17.GUIDES TO MAINTENANCE
    • 18.OUTLINES OF SERVICE
      • 18.1 OUTLINE OF OIL,FUEL,COOLANT
      • 18.2 OUTLINE OF ELECTRICAL SYSTEM
      • 18.3 OUTLINE OF HYDRAULIC SYSTEM
      • 18.4 RELEASING PRESSURE
      • 18.5 BLEEDING AIR FROM CIRCUIT
      • 18.6 OIL FILTER AND LEVEL GAUGE POSITIONS
    • 19.CONSUMABLE PARTS LIST
    • 20.USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • 21.STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • 21.1 INTRODUCTION OF NECESSARY TOOLS
      • 21.2 TORQUE LIST
    • 22.PERIODIC REPLACEMENT OF CRITICAL SAFETY PARTS
    • 23.MAINTENANCE SCHEDULE CHART
      • 23.1 MAINTENANCE SCHEDULE CHART
    • 24.SERVICE PROCEDURE
      • 24.1 INITIAL 100 HOURS SERVICE
      • 24.2 INITIAL 250 HOURS SERVICE
      • 24.3 WHEN REQUIRED
      • 24.4 CHECK BEFORE STARTING
      • 24.5 EVERY 10 HOURS SERVICE
      • 24.6 EVERY 100 HOURS SERVICE
      • 24.7 EVERY 250 HOURS SERVICE
      • 24.8 EVERY 500 HOURS SERVICE
      • 24.9 EVERY 1000 HOURS SERVICE
      • 24.10 EVERY 2000 HOURS SERVICE
      • 24.11 EVERY 4000 HOURS SERVICE
  • SPECIFICATIONS
    • 25.SPECIFICATIONS
  • OPTIONS,ATTACHMENTS
    • 26.GENERAL PRECAUTIONS
      • 26.1 PRECAUTIONS RELATED TO SAFETY
      • 26.2 PRECAUTIONS WHEN INSTALLING ATTACHMENTS
    • 27.HANDLING BUCKET WITH HOOK
      • 27.1 CHECKING FOR DAMAGE TO BUCKET WITH HOOK
      • 27.2 PROHIBITED OPERATIONS
      • 27.3 PRECAUTIONS DURING OPERATIONS
    • 28.USING SEAT BELT
      • 28.1 SEAT BELT
    • 29.INTRODUCTION OF ATTACHMENTS
      • 29.1 SPECIFICATION,USE
  • BACK HOE TYPE SHOVEL
    • 30.GENERAL LOCATIONS
    • 31.INSTRUMENTS AND CONTROLS
      • 31.1 SWITCH
      • 31.2 CONTROL LEVERS
      • 31.3 CONTROL BOX
      • 31.4 FUSE BOX
    • 32.OPERATION
      • 32.1 OPERATION OF WORK EQUIPMENT
      • 32.2 CHECK BEFORE STARTING ENGINE
    • 33.PRECAUTIONS FOR MACHINE OPERATION
      • 33.1 PRECAUTONS DURING OPERATION
    • 34.PRECAUTIONS WHEN DISASSEMBLING MACHINE
    • 35.MAINTENANCE
      • 35.1 OIL FILLER AND LEVEL GAUGE POSITION
      • 35.2 ADJUST BUCKET CLEARANCE
      • 35.3 CHECK BEFORE STARTING
      • 35.4 EVERY 10 HOURS SERVICE
    • 36.EXCAVATOR WORK
    • 37.TRANSPORTATION
    • 38.INTRODUCTION OF ATTACHMENTS
      • 38.1 ATTACHMENT INSTALLATION COMBINATION TABLE
      • 38.2 SPECIFICATION,USE
    • 39.SPECIFICATIONS

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop