$ 0
0
$ 0
0

Komatsu PC210-10, PC210LC-10 Hydraulic Excavator Operation and Maintenance Manual (UENAM01271)

Format: PDF (Printable Document)

File Language: English

File Pages: 482

File Size: 36.25 MB (Speed Download Link)

Brand: Komatsu

Model: PC210-10, PC210LC-10 Hydraulic Excavator

Book No: UENAM01271

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC210-10, PC210LC-10 Hydraulic Excavator Operation and Maintenance Manual (UENAM01271)

Komatsu PC210-10, PC210LC-10 Hydraulic Excavator Operation and Maintenance Manual (UENAM01271)

📘 Show Index

Komatsu PC210-10, PC210LC-10 Hydraulic Excavator Index:

  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
      • NOISE (PC210-10, PC210LC-10)
    • INTRODUCTION
      • DEMOLITION WORK
      • DIRECTIONS OF MACHINE
      • OPERATOR PROTECTIVE STRUCTURE
      • VISIBILITY FOR OPERATOR
    • PRODUCT INFORMATION
      • PRODUCT IDENTIFICATION NUMBER (PIN) / MACHINE SERIAL NO. PLATE
      • EPA REGULATIONS, ENGINE NUMBER PLATE
      • SERVICE METER LOCATION
      • YOUR MACHINE SERIAL NUMBER AND DISTRIBUTOR
      • SERIAL PLATE
    • Contents
  • SAFETY
    • SAFETY
    • SAFETY LABELS
      • LOCATION OF SAFETY LABELS
      • SAFETY LABELS
    • GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
      • PRECAUTIONS BEFORE STARTING ENGINE
      • PREPARATIONS FOR SAFE OPERATION
      • FIRE PREVENTION
      • PRECAUTIONS WHEN GETTING ON OR OFF MACHINE
      • DO NOT GET CAUGHT IN WORK EQUIPMENT
      • PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
      • PROTECTION AGAINST FALLING, FLYING OR INTRUDING OBJECTS
      • ACTIONS IN THE EVENT OF DAMAGE TO SAFETY STRUCTURES
      • UNAUTHORIZED MODIFICATION
      • PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
      • PRECAUTIONS RELATED TO CAB GLASS
      • PRECAUTIONS WHEN RUNNING ENGINE INSIDE BUILDING
    • PRECAUTIONS FOR OPERATION
      • PRECAUTIONS FOR JOBSITE
    • SAFETY MACHINE OPERATION
      • STARTING ENGINE
      • WHEN OPERATING
      • TRANSPORTATION
      • TOWING
      • LIFTING OBJECTS WITH BUCKET LINK LIFTING DEVICE (OPTIONAL EQUIPMENT)
      • SAFETY RULES FOR LIFTING OBJECTS
    • PRECAUTIONS FOR MAINTENANCE
      • PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
      • PRECAUTIONS FOR INSPECTION AND MAINTENANCE
  • OPERATION
    • GENERAL VIEW
      • GENERAL VIEW OF MACHINE
      • GENERAL VIEW OF CAB
      • GENERAL VIEW OF CONTROLS AND GAUGES
    • EXPLANATION OF COMPONENTS
      • MACHINE MONITOR
      • SWITCHES
      • CONTROL LEVERS AND PEDALS
      • CEILING WINDOW
      • OPENING AND CLOSING CAB FRONT WINDOW
      • EMERGENCY ESCAPE HAMMER
      • DOOR LOCK
      • CAB DOOR HINGE
      • OPENING AND CLOSING ENGINE HOOD
      • CAPS AND COVERS WITH LOCK
      • DRINK BOX
      • MAGAZINE BOX
      • CUP HOLDER
      • ASHTRAY
      • HANDLING AIR CONDITIONER
      • HANDLING RADIO
      • SPACE FOR RADIO CASSETTE
      • AUXILIARY ELECTRIC POWER
      • FUSE
      • FUSIBLE LINK
      • CONTROLLER
      • TOOL BOX
      • GREASE PUMP HOLDER
      • FIRE EXTINGUISHER
      • BATTERY DISCONNECT SWITCH
      • SYSTEM OPERATING LAMP
      • HANDLING KDPF
      • HANDLING KCCV
      • HANDLING MACHINES EQUIPPED WITH KOMTRAX
    • MACHINE OPERATIONS AND CONTROLS
      • CHECKS AND ADJUSTMENT BEFORE STARTING ENGINE
      • STARTING ENGINE
      • OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • STOPPING ENGINE
      • MACHINE OPERATION
      • STEERING MACHINE
      • SWINGING MACHINE
      • WORK EQUIPMENT CONTROLS AND OPERATIONS
      • WORKING MODE
      • PROHIBITED OPERATIONS
      • RULES FOR OPERATION
      • TRAVELLING ON SLOPES
      • ESCAPE FROM MUD
      • RECOMMENDED APPLICATIONS
      • REPLACING AND INVERTING BUCKET
      • WHEN PARKING MACHINE
      • AFTER DAILY WORK COMPLETION
      • LOCKING
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • LOADING AND UNLOADING WITH TRAILER
      • LIFTING MACHINE
    • COLD WEATHER OPERATION
      • COLD WEATHER OPERATION INFORMATION
      • AFTER DAILY WORK COMPLETION
      • AFTER COLD WEATHER SEASON
    • LONG-TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STARTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLES AND ACTIONS
      • RUNNING OUT OF FUEL
      • PHENOMENA THAT ARE NOT FAILURES
      • TOWING MACHINE
      • LIGHTWEIGHT TOWING HOLE
      • SEVERE JOB CONDITION
      • DISCHARGED BATTERY
      • OTHER TROUBLE
  • MAINTENANCE
    • RULES FOR MAINTENANCE
      • SERVICE METER READING
      • KOMATSU GENUINE REPLACEMENT PARTS
      • KOMATSU GENUINE LUBRICANTS
      • ALWAYS USE CLEAN WASHER FLUID
      • FRESH AND CLEAN LURICANTS
      • CHECK DRAINED OIL AND USED FILTER
      • FUEL STRAINER
      • WELDING INSTRUCTIONS
      • DO NOT DROP THINGS INSIDE MACHINE
      • DUSTY WORKSITES
      • AVOID MIXING OIL
      • LOCKING INSPECTION COVERS
      • BLEEDING AIR FROM HYDRAULIC CIRCUIT
      • PRECAUTIONS WHEN INSTALLING HYDRAULIC HOSES
      • CHECKS AFTER INSPECTION AND MAINTENANCE
      • FUEL AND LUBRICANTS TO MATCH THE AMBIENT TEMPERATURE
      • CLOSE ENGINE HOOD SECURELY
    • OUTLINE OF SERVICE
      • HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
      • HANDLING ELECTRICAL COMPONENTS
    • STANDARD TIGHTENING TORQUE FOR BOLTS AND NUTS
      • TIGHTENING TORQUE LIST
    • MAINTENANCE SCHEDULE
      • MAINTENANCE SCHEDULE TABLE
      • MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
    • MAINTENANCE SCHEDULE TABLE
      • INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
      • WHEN REQUIRED
      • CHECKS BEFORE STARTING
      • EVERY 100 HOURS MAINTENANCE
      • EVERY 250 HOURS MAINTENANCE
      • EVERY 500 HOURS MAINTENANCE
      • EVERY 1000 HOURS MAINTENANCE
      • EVERY 2000 HOURS MAINTENANCE
      • EVERY 4000 HOURS MAINTENANCE
      • EVERY 4500 HOURS MAINTENANCE
      • EVERY 5000 HOURS MAINTENANCE
      • EVERY 8000 HOURS MAINTENANCE
    • END OF SERVICE LIFE
  • SPECIFICATIONS
    • SPECIFICATIONS
      • EXPLANATION OF LIFTING CAPACITY CHART PC210, PC210LC-10 1- PIECE BOOM
  • ATTACHMENTS AND OPTIONS
    • GENERAL PRECAUTIONS FOR SAFETY
      • PRECAUTIONS WHEN SELECTING
      • READ THE OPERATION AND MAINTENANCE MANUAL THOROUGHLY
      • PRECAUTIONS WHEN REMOVING OR INSTALLING
      • PRECAUTIONS WHEN USING
    • HANDLING QUICK COUPLER
    • AUTOMATIC GREASE SYSTEM
      • CHECK AUTO-GREASING SYSTEM
    • BUCKET WITH HOOK
      • HOOK CONDITION
      • PROHIBITED OPERATIONS
    • MACHINE READY FOR INSTALLATION OF ATTACHMENT
      • EXPLANATION OF COMPONENTS
      • HYDRAULIC CIRCUIT
      • REMOVAL AND INSTALLATION OF ATTACHMENT
      • ATTACHMENT OPERATIONS
      • LONG-TERM STORAGE
      • SPECIFICATIONS
      • ARM/PIN INFORMATION
    • ATTACHMENTS AND OPTIONS
      • ATTACHMENT COMBINATIONS
      • TOOL CONTROL SYSTEM
      • TRACK SHOES SELECTION
      • BUCKET TEETH SELECTION
      • HANDLING OF RUBBER PAD SHOE AND ROAD LINER
      • HANDLING TRAPEZOIDAL BUCKET
      • HANDLING EXTENSION ARM
      • HANDLING CLAMSHELL BUCKET
    • RECOMMENDED ATTACHMENT OPERATIONS
      • HYDRAULIC BREAKER
  • SUPER LONG FRONT BOOM AND ARM
    • OPERATION INSTRUCTION FOR SUPER LONG FRONT BOOM AND ARM
      • CONTROL LEVERS, PEDALS
      • TRANSPORT & STORAGE OF SUPER LONG FRONT MACHINE
      • WORKING RANGE OF SUPER LONG FRONT
      • LIFTING CAPACITY PC210LC-10 (15M) SUPER LONG FRONT
    • MAINTENANCE
      • SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
      • EVERY 50 HOURS SERVICE
      • EVERY 100 HOURS SERVICE
  • REPLACEMENT PARTS
    • SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS
    • CONSUMABLE PARTS
      • CONSUMABLE PARTS LIST
    • RECOMMENDED FUEL, COOLANT, AND LUBRICANT
      • LUBRICATION CHART
      • FUEL, COOLANT, AND LUBRICANTS TO MATCH THE AMBIENT TEMPERATURE
      • RECOMMENDED BRANDS AND QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
  • INDEX

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop