$ 0
0
$ 0
0

Komatsu PC95-1 Operation and Maintenance Manual (FGADPC9510)

Format: PDF (Printable Document)

File Language: English

File Pages: 171

File Size: 36.06 MB (Speed Download Link)

Brand: Komatsu

Model: PC95-1

Book No: FGADPC9510

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC95-1 Operation and Maintenance Manual (FGADPC9510)

Komatsu PC95-1 Operation and Maintenance Manual (FGADPC9510)

📘 Show Index

Komatsu PC95-1 Index:

  • MAIN MENU
  • CONTENTS
  • FOREWORD
  • SAFETY INFORMATION
  • INTRODUCTION
  • PERMITTED USES
  • MAIN FEATURES
  • RUNNING IN THE MACHINE
  • SUMMARY OF PICTOGRAMS
  • LOCATION OF MACHINE COMPONENT IDENTIFICATION PLATES
  • SERIAL NUMBERS AND ADDRESS OF DEALER
  • POSITION AND CONTENTS OF <<CE>> PLATE
  • SAFETY AND ACCIDENT PREVENTION
    • 1. SAFETY MEASURES
      • 1.1 GENERAL PRECAUTIONS
      • 1.2 SAFETY DEVICES
      • 1.3 PERSONAL PROTECTIVE CLOTHING AND EQUIPMENT
      • 1.4 UNAUTHORISED MODIFICATIONS
      • 1.5 LEAVING THE DRIVING SEAT
      • 1.6 ENTERING AND LEAVING THE MACHINE
      • 1.7 PREVENTION OF FUEL AND OIL FIRES
      • 1.8 PREVENTION OF BURNS AND SCALDING
      • 1.9 PREVENTION OF ASBESTOS DUST CONTAMINATION
      • 1.10 PREVENTION OF INJURY BY WORK EQUIPMENT
      • 1.11 FIRE EXTINGUISHERS AND FIRST AID KIT
      • 1.12 PRECAUTIONS REGARDING THE CAB FRAME
      • 1.13 PRECAUTIONS REGARDING EQUIPMENT
  • PRECAUTIONS
    • 2. PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE
      • 2.1 ON-SITE SAFETY
      • 2.2 FIRE PREVENTION
      • 2.3 PRECAUTIONS REGARDING THE CAB
      • 2.4 VENTILATION OF ENCLOSED AREAS
      • 2.5 CLEANING WINDOWS, MIRRORS AND HEADLIGHTS – CHECKING WIPER BLADES, LAMPS
    • 3. PRECAUTIONS TO BE TAKEN WHILE WORKING
      • 3.1 STARTING THE ENGINE
      • 3.2 CHECKS PRIOR TO REVERSING
      • 3.3 MOVING THE MACHINE
      • 3.4 WORKING ON SLOPES
      • 3.5 PREVENTION OF ELECTROCUTION
      • 3.6 VISIBILITY
      • 3.7 WORKING ON FROZEN OR SNOW-COVERED GROUND
      • 3.8 PREVENTION OF DAMAGE BY THE EQUIPMENT
      • 3.9 WORKING ON LOOSE OR PLOUGHED SOIL
      • 3.10 PARKING THE MACHINE
    • 4. TRANSPORTING THE MACHINE ON ANOTHER VEHICLE
      • 4.1 LOADING AND UNLOADING
      • 4.2 THE ROUTE
    • 5. THE BATTERY
      • 5.1 SAFETY PRECAUTIONS FOR WORK ON BATTERIES
      • 5.2 STARTING THE ENGINE WITH JUMP LEADS
    • 6. PRECAUTIONS FOR EMERGENCY RECOVERY
    • 7. PRECAUTIONS TO BE TAKEN DURING MAINTENANCE
      • 7.1 WARNING NOTICES
      • 7.2 TOOLS
      • 7.3 PERSONAL PRECAUTIONS
      • 7.4 EQUIPMENT
      • 7.5 KEEPING THE MACHINE CLEAN
      • 7.6 RUNNING THE ENGINE DURING MAINTENANCE
      • 7.7 RULES FOR REFUELLING AND ADDING OIL
      • 7.8 LEVEL OF COOLANT IN THE RADIATOR
      • 7.9 USING LAMPS
      • 7.10 BATTERY AND ALTERNATOR PRECAUTIONS
      • 7.11 PRECAUTIONS REGARDING HIGH PRESSURE HOSES
      • 7.12 PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGH PRESSURE SYSTEMS
      • 7.13 PRECAUTIONS FOR MAINTENANCE WORK INVOLVING HIGH TEMPERATURES AND PRESSURES
      • 7.14 THE RADIATOR COOLING FAN AND FAN BELT
    • 8. SAFETY AND NOISE ABATEMENT NOTICES
      • 8.1 LOCATION OF SAFETY NOTICES
      • 8.2 LOCATION OF NOISE ABATEMENT NOTICES
    • 9. VIBRATIONS TO WHICH THE USER IS SUBJECTED
  • TECHNICAL SPECIFICATIONS
    • 10. TECHNICAL SPECIFICATIONS
      • 10.1 OVERALL DIMENSIONS
      • 10.2 TECHNICAL SPECIFICATIONS
      • 10.3 LIFTING CAPACITY
  • THE MACHINE AND ITS OPERATIONS
    • 11. SAFETY DEVICES
      • 11.1 EQUIPMENT SAFETY DEVICES
    • 12. GENERAL VIEWS
      • 12.1 GENERAL VIEW (MONOBLOCK BOOM)
      • 12.2 GENERAL VIEW (ARTICULATED BOOM)
      • 12.3 GENERAL VIEW OF INSIDE OF CAB
    • 13. INSTRUMENTS AND CONTROLS
      • 13.1 INSTRUMENTS, WARNING LIGHTS, AND PUSH-BUTTONS
      • 13.2 LOCATION OF MACHINE CONTROLS
    • 14. FUSES AND RELAYS
      • 14.1 FUSES
      • 14.2 RELAYS
    • 15. THE CAB AND DRIVING POSITION
      • 15.1 THE CAB
      • 15.2 VENTILATION AND HEATING
      • 15.3 THE DRIVING SEAT
      • 15.4 THE SAFETY BELT
      • 15.5 EMERGENCY EXIT
      • 15.6 FIRE EXTINGUISHERS
      • 15.7 FIRST AID KIT
      • 15.8 TECHNICAL DOCUMENTATION
    • 16. OPERATING THE MACHINE
      • 16.1 CHECKS PRIOR TO STARTING THE ENGINE
      • 16.2 STARTING THE ENGINE
      • 16.3 WARMING UP THE ENGINE
      • 16.4 WARMING UP THE HYDRAULIC FLUID
      • 16.5 MOVING THE MACHINE
    • 17. PARKING THE MACHINE
      • 17.1 PARKING ON LEVEL GROUND
      • 17.2 PARKING ON A SLOPE
    • 18. STOPPING THE ENGINE
    • 19. TRANSPORTING THE MACHINE ON ANOTHER VEHICLE
      • 19.1 LOADING AND UNLOADING
      • 19.2 THE ROUTE
    • 20. COLD WEATHER PRECAUTIONS
      • 20.1 FUEL AND LUBRICANTS
      • 20.2 COOLANT
      • 20.3 THE BATTERY
      • 20.4 OTHER PRECAUTIONS
      • 20.5 PRECAUTIONS AT THE END OF A WORKING DAY
    • 21. WARM WEATHER PRECAUTIONS
    • 22. USING THE WORK EQUIPMENT
      • 22.1 ORGANISATION OF THE WORK AREA
      • 22.2 POSITIONING THE BUCKET ACCORDING TO THE JOB
      • 22.3 POSITIONING THE MACHINE FOR DIGGING
      • 22.4 DIGGING METHOD
      • 22.5 CHANGING THE WORK EQUIPMENT
    • 23. FAULT FINDING
      • 23.1 RUNNING OUT OF FUEL
      • 23.2 IF THE BATTERY IS FLAT
      • 23.3 OTHER FAULTS
  • MAINTENANCE
    • 24. MAINTENANCE GUIDE
    • 25. MAINTENANCE NOTES
      • 25.1 ENGINE MAINTENANCE NOTES
      • 25.2 HYDRAULIC SYSTEM MAINTENANCE NOTES
      • 25.3 ELECTRICAL SYSTEM MAINTENANCE NOTES
      • 25.4 NOTES ON LUBRICATION
      • 25.5 PARTS SUBJECT TO RAPID WEAR AND REQUIRING REGULAR REPLACEMENT
    • 26. FUEL, COOLANT, AND LUBRICANTS
    • 27. NUT AND BOLT TIGHTENING TORQUES
      • 27.1 STANDARD TIGHTENING TORQUES
      • 27.2 SPECIAL TIGHTENING TORQUES
    • 28. LUBRICATION
      • 28.1 LUBRICATION CHART
    • 29. SCHEDULED MAINTENANCE
      • 29.1 PRE-STARTING CHECKS
      • 29.2 AFTER THE FIRST 50 HOURS
      • 29.3 EVERY 50 HOURS
      • 29.4 EVERY 100 HOURS
      • 29.5 AFTER THE FIRST 250 HOURS
      • 29.6 EVERY 250 HOURS
      • 29.7 EVERY 500 HOURS
      • 29.8 EVERY 1000 HOURS
      • 29.9 EVERY 2000 HOURS
      • 29.10 OCCASIONAL MAINTENANCE
    • 30. EXTENDED PERIODS OF DISUSE
      • 30.1 PREPARING TO LAY UP THE MACHINE
      • 30.2 PREPARING THE MACHINE FOR USE
  • AUTHORISED OPTIONAL EQUIPMENT
    • 31. AUTHORISED OPTIONAL EQUIPMENT
      • 31.1 OPTIONAL EQUIPMENT CHARACTERISTICS
    • 32. DEMOLITION HAMMER
      • 32.1 DESCRIPTION AND OPERATION
      • 32.2 FITTING AND REMOVING THE DEMOLITION HAMMER
    • 33. CLAMSHELL BUCKET
      • 33.1 DESCRIPTION AND OPERATION
      • 33.2 FITTING THE CLAMSHELL BUCKET

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop