$ 0
0
$ 0
0

Komatsu WA250-5H Wheel Loader Operation and Maintenance Manual (VEAM230100)

Format: PDF (Printable Document)

File Language: English

File Pages: 241

File Size: 9.45 MB (Speed Download Link)

Brand: Komatsu

Model: WA250-5H Wheel Loader

Book No: VEAM230100

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu WA250-5H Wheel Loader Operation and Maintenance Manual (VEAM230100)

Komatsu WA250-5H Wheel Loader Operation and Maintenance Manual (VEAM230100)

📘 Show Index

Komatsu WA250-5H Wheel Loader Index:

  • WA250-5H
  • FOREWORD
    • Foreword
    • Safety information
    • Introduction
      • Directions of machine
    • Necessary information
      • Machine serial No. plate and position
      • Engine serial No. plate and position
      • Position of service meter
      • Table to enter serial No. and distributor
    • Contents
    • Dimensions, weights and operating data
      • WA250-5H: Dimensions, weights and operating data
    • CE-conforming equipment
      • CE-conforming equipment
      • Manufacturer-supplied CE-conforming equipment, according to document421-93-H1900
  • SAFETY
    • Safety labels
      • Location of safety labels
      • Presentation of safety labels
    • General precautions
      • Safety rules
    • Precautions for operation
      • Starting engine
      • Operation
      • Transportation
      • Battery
      • Towing
    • Precautions for maintenance
      • Safety instructions
    • Precautions with tires
      • Handling tires
      • Precautions when storing tires
  • OPERATION
    • General view
      • General view of machine
      • General view of controls and gauges
    • Explanation of components
      • Machine monitor
      • Switches
      • Control levers, pedals
      • Steering tilt lock lever
      • Cap and cover with lock
      • Safety bar
      • Towing pin
      • Grease pump
      • Cab door inner lock
      • Cab door open lock
      • Cab window open lock cancel knob
      • Fuse
      • Slow blow fuse
      • Power outlet
      • Air conditioner
      • Handling cab wiper
    • Operation
      • Check before starting engine, adjust
      • Starting engine
      • Operations and checks after starting engine
      • Stopping engine
      • Moving the machine (Directional, speed), stopping the machine
      • Turning
      • Operation of work equipment
      • Work possible using wheel loader
      • Precautions for operation
      • Adjusting work equipment posture
      • Parking machine
      • Check after stopping engine
      • Checks after completion of operation
      • Locking
      • Handling the tires
    • Transportation
      • Transportation procedure
      • Loading, unloading work with trailers
      • Lifting machine
    • Cold weather operation
      • Precautions for low temperature
      • Precautions after completion of work
      • After cold weather
      • Warming-up operation for steering hydraulic circuit in cold weather
    • Long-term storage
      • Before storage
      • During storage
      • After storage
    • Troubleshooting
      • When machine runs out of fuel
      • Towing the machine
      • If battery is discharged
      • Other trouble
  • MAINTENANCE
    • Guides to maintenance
    • Outlines of service
      • Handling oil, fuel, coolant and performing oil clinic
      • Outline of electric system
    • Wear parts
      • Wear parts list
    • Fuel, coolant and lubricants
      • Lubrication chart
      • Proper selection of fuel, coolant and lubricants
    • Standard tightening torques for bolts and nuts
      • Torque list
    • Periodic replacement of safety critical parts
      • Safety critical parts
    • Maintenance schedule chart
      • Maintenance schedule chart
    • Service procedure
      • Initial 250 hours service (only after the first 250 hours)
      • When required
      • Check before starting
      • Every 50 hours service
      • Every 100 hours service
      • Every 250 hours service
      • Every 500 hours service
      • Every 1000 hours service
      • Every 2000 hours service
      • Every 4000 hours service
  • TECHNICAL DATA
    • Technical data
    • Noise emission levels
    • Vibration level
  • ATTACHMENTS, OPTIONS
    • Selecting bucket and tires
    • Method of using 2 levers
      • Explanation of components
      • Operation
    • Central lubrication system
      • Operating the central lubrication system
      • Display and control unit
      • Changing the lubrication interval times
  • INDEX
    • Index

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop