Format: PDF (Printable Document)
File Language: English
File Pages: 162
File Size: 45.96 MB (Speed Download Link)
Brand: Link Belt
Model: 80 Spin Ace Interim Tier 4 Excavator
Type of Document: Operators Manual
$ 40
On a machine this size, you’re usually trenching in tight lots, working around utilities, or loading trucks where space is cramped. This operators manual is what I keep handy to make sure the 80 Spin Ace is started, run, and shut down the way the engine and hydraulics were designed for. It walks you through the control logic, warning lights, and daily walk‑around so you don’t cook a pump or plug the aftertreatment. For example, if the machine starts derating or showing an emissions warning, this is what I’d use to verify the right startup sequence, idle times, and checks before calling it a “bad sensor.”
Applications & Use Cases
FAQ
Q: Can I keep this manual on a tablet in the cab?
A: Yes, as long as the file is readable offline and the screen is bright enough, it’s handy for quick checks between cycles.
Q: Is it worth printing parts of it?
A: I’d print the startup/shutdown and daily inspection pages, laminate them, and keep them in the cab for any operator.
Safety Note
Always follow the manual’s procedures step by step before starting work, especially when other people are near the machine.