$ 0
0
$ 0
0

Komatsu D275A-5R Bulldozer Operation and Maintenance Manual (PEN01261-01)

Format: PDF (Printable Document)

File Language: English

File Pages: 343

File Size: 10.87 MB (Speed Download Link)

Brand: Komatsu

Model: D275A-5R Bulldozer

Book No: PEN01261-01

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu D275A-5R Bulldozer Operation and Maintenance Manual (PEN01261-01)

Komatsu D275A-5R Bulldozer Operation and Maintenance Manual (PEN01261-01)

📘 Show Index

Komatsu D275A-5R Bulldozer Index:

  • COVER
  • FOREWORD
    • READ THIS MANUAL
    • SAFETY INFORMATION
    • INTRODUCTION
      • USE OF MACHINE
      • FRONT/REAR, LEFT/RIGHT DIRECTIONS OF MACHINE
      • VISIBILITY FROM OPERATOR’S SEAT
    • NECESSARY INFORMATION
      • PRODUCT IDENTIFICATION NUMBER (PIN), MACHINE SERIAL NO. PLATE
      • ENGINE SERIAL NUMBER PLATE
      • BLADE SERIAL NO. PLATE POSITION
      • RIPPER SERIAL NO. PLATE POSITION
      • ROPS, FOPS NO. PLATE POSITION
      • POSITION OF SERVICE METER
      • TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
    • CONTENTS
  • SAFETY
    • SAFETY
    • SAFETY LABELS
      • POSITIONS OF SAFETY PICTOGRAMS
      • SAFETY LABELS
    • GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
      • PRECAUTIONS BEFORE STARTING OPERATION
      • PREPARATIONS FOR SAFE OPERATION
      • FIRE PREVENTION
      • PRECAUTIONS WHEN GETTING ON OR OFF MACHINE
      • DO NOT GET CAUGHT IN WORK EQUIPMENT
      • PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
      • UNAUTHORIZED MODIFICATION
      • PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
      • PRECAUTIONS WHEN RUNNING ENGINE INSIDE BUILDING
    • PRECAUTIONS FOR OPERATION
      • PRECAUTIONS FOR JOBSITE
      • STARTING ENGINE
      • OPERATION
      • TRANSPORTATION
      • TOWING
    • PRECAUTIONS FOR MAINTENANCE
      • PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
      • PRECAUTIONS FOR INSPECTION AND MAINTENANCE
  • OPERATION
    • GENERAL VIEW
      • GENERAL VIEW OF MACHINE
      • GENERAL VIEW OF CONTROLS AND GAUGES
    • EXPLANATION OF COMPONENTS
      • FRONT PANEL
      • SWITCHES
      • CONTROL LEVERS, PEDALS
      • DUST INDICATOR
      • POWER SOURCE
      • FUSE BOX
      • DOOR OPEN LOCK
      • SASH GLASS INTERMEDIATE LOCK
      • CAP WITH LOCK
      • DOOR POCKET
      • ASHTRAY
      • TOOL BOX
      • CAR STEREO, HANDLING
      • AIR CONDITIONER, HANDLING
    • OPERATION
      • CHECK BEFORE STARTING ENGINE, ADJUST
      • STARTING ENGINE
      • OPERATIONS AND CHECKS AFTER STARTING ENGINE
      • STOPPING ENGINE
      • MOVING MACHINE
      • STOPPING MACHINE
      • SHIFTING GEAR
      • SHIFTING BETWEEN FORWARD AND REVERSE
      • STEERING MACHINE
      • PRECAUTIONS FOR OPERATION
      • PARKING MACHINE
      • CHECK AFTER STOPPING ENGINE
      • CHECK AFTER FINISHING WORK
      • LOCKING
      • WORK POSSIBLE USING BULLDOZER
      • RIPPER OPERATION
      • OPERATING METHOD FOR RIPPING OPERATIONS
      • ADJUSTING POSTURE OF WORK EQUIPMENT
      • TIPS FOR LONGER UNDERCARRIAGE LIFE
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • LOADING, UNLOADING WORK
      • METHOD OF LIFTING MACHINE
      • INSTALLATION OF CAB
      • INSTALLATION OF ROPS
    • COLD WEATHER OPERATION
      • PRECAUTIONS FOR LOW TEMPERATURE
      • AFTER COMPLETION OF WORK
      • AFTER COLD WEATHER
    • LONG-TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STARTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLESHOOTING
      • AFTER RUNNING OUT OF FUEL
      • METHOD OF TOWING MACHINE
      • IF BATTERY IS DISCHARGED
      • OTHER TROUBLE
  • MAINTENANCE
    • GUIDES TO MAINTENANCE
    • OUTLINES OF SERVICE
      • HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
      • OUTLINE OF ELECTRIC SYSTEM
    • WEAR PARTS
      • WEAR PARTS LIST
    • RECOMMENDED FUEL, COOLANT, AND LUBRICANT
      • RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
    • STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • TORQUE LIST
    • PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS
    • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE SCHEDULE CHART
    • SERVICE PROCEDURE
      • INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 250 HOURS SERVICE
      • EVERY 500 HOURS SERVICE
      • EVERY 1000 HOURS SERVICE
      • EVERY 2000 HOURS SERVICE
      • EVERY 4000 HOURS SERVICE
      • EVERY 8000 HOURS SERVICE
  • SPECIFICATIONS
    • SPECIFICATIONS
  • ATTACHMENTS, OPTIONS
    • GENERAL PRECAUTIONS
      • PRECAUTIONS RELATED TO SAFETY
    • SELECTION OF TRACK SHOE
      • SELECTION OF TRACK SHOES
    • PROCEDURE FOR SELECTING RIPPER POINT
      • PROCEDURE FOR SELECTING RIPPER POINT
    • EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
      • BLADE CONDITION
      • DOZING WORK
      • LEVELING (SPREADING) OPERATION
      • DITCHING OPERATION
      • BOULDER RAISING OPERATION
      • SIDE-CUTTING OPERATIONS
      • HORIZONTAL DOZING OPERATIONS FROM SIDE SLOPE (ROUGH GROUND)
    • SHOE SLIP CONTROL
      • MODE SELECTION SWITCH PANEL (SHOE SLIP CONTROL)
      • EFFECTIVE USE OF MODE SELECTION SYSTEM
      • IF MODE SELECTION SYSTEM FLASHES
    • HANDLING MACHINES EQUIPPED WITH KOMTRAX
      • BASIC PRECAUTIONS
  • INDEX

Link Belt

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop