$ 0
0
$ 0
0

Komatsu LW100-1 Rough Terrain Crane Operation and Maintenance Manual (SEAM017200)

Format: PDF (Printable Document)

File Language: English

File Pages: 393

File Size: 19.08 MB (Speed Download Link)

Brand: Komatsu

Model: LW100-1 Rough Terrain Crane

Book No: SEAM017200

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu LW100-1 Rough Terrain Crane Operation and Maintenance Manual (SEAM017200)

Komatsu LW100-1 Rough Terrain Crane Operation and Maintenance Manual (SEAM017200)

📘 Show Index

Komatsu LW100-1 Rough Terrain Crane Index:

  • COVER
  • 1.FOREWORD
  • 2.SAFETY INFORMATION
  • 3.INTRODUCTION
  • 4.LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 5.CONTENTS
  • SAFETY
    • 6.GENERAL PRECAUTIONS
    • 7.PRECAUTIONS DURING OPERATION
      • 7.1 BEFORE STARTING ENGINE
      • 7.2 OPERATING MACHINE
      • 7.3 PRECAUTIONS WHEN TRAVELING
      • 7.4 PRECAUTIONS WHEN USING CRANE
      • 7.5 BATTERY
      • 7.6 TOWING
    • 8.PRECAUTIONS FOR MAINTENANCE
      • 8.1 BEFORE CARRYING OUT MAINTENANCE
      • 8.2 DURING MAINTENANCE
      • 8.3 TIRES
    • 9.POSITION FOR ATTACHING SAFETY LABELS
  • OPERATION
    • 10.GENERAL LOCATIONS
      • 10.1 GENERAL VIEW OF MACHINE
      • 10.2 GENERAL VIEW OF CONTROLS AND GAUGES
    • 11.EXPLANATION OF COMPONENTS
      • 11.1 OUTLINE OF INSIDE OF OPERATOR’S COMPARTMENT
      • 11.2 FRONT PANEL GROUP
      • 11.3 TOP PANEL GROUP
      • 11.4 LEFT SIDE PANEL GROUP
      • 11.5 RIGHT SIDE PANEL GROUP
      • 11.6 PEDAL GROUP
      • 11.7 ASHTRAY
      • 11.8 ROOM LAMP
      • 11.9 COOL BOX
      • 11.10 OUTRIGGER CONTROL PANEL
      • 11.11 SUNROOF VISOR
      • 11.12 SMOKE CANDLE HOLDER
      • 11.13 FIRE EXTINGUISHER HOLDER
      • 11.14 CAB SLIDE DOOR
      • 11.15 DOOR OPEN LOCK
      • 11.16 POCKET BEHIND SEAT
      • 11.17 TOOL BOX
      • 11.18 FUSE BOX
      • 11.19 TAKING OFF POWER
      • 11.20 CAR RADIO
      • 11.21 AIR CONDITIONER
      • 11.22 MOMENT LIMITER (OVERLOAD PREVENTION SYSTEM) EXTERNAL PILOT LAMP (IF EQUIPPED)
    • 12.OPERATION
      • 12.1 CHECK BEFORE STARTING ENGINE
      • 12.2 STARTING ENGINE
      • 12.3 OPERATION,CHECK AFTER STARTING ENGINE
      • 12.4 PREPARATIONS BEFORE MOVING MACHINE OFF
      • 12.5 MOVING MACHINE OFF
      • 12.6 SHIFTING GEARS
      • 12.7 TRAVELING DOWNHILL
      • 12.8 STEERING MACHINE
      • 12.9 STOPPING MACHINE
      • 12.10 TRAVELING ON ROUGH GROUND
      • 12.11 SPECIAL TRAVEL
      • 12.12 SWITCHING BETWEEN FORWARD AND REVERSE
      • 12.13 PRECAUTIONS WHEN TRAVELING
      • 12.14 PRECAUTIONS BEFORE CRANE OPERATIONS
      • 12.15 OUTLINE OF CRANE OPERATIONS
      • 12.16 OUTRIGGER OPERATIONS
      • 12.17 WHEN OUTRIGGERS ARE NOT USED (ON-TIRE OPERATIONS)
      • 12.18 MAIN WINCH OPERATIONS
      • 12.19 AUXILIARY WINCH OPERATIONS
      • 12.20 BOOM HOIST OPERATIONS
      • 12.21 BOOM TELESCOPE OPERATIONS
      • 12.22 SWING OPERATIONS
      • 12.23 ADJUSTING OPERATING SPEED
      • 12.24 OPERATING POSTURE
      • 12.25 PARKING MACHINE
      • 12.26 CHECK AFTER FINISHING OPERATION
      • 12.27 STOPPING ENGINE
      • 12.28 CHECK AFTER STOPPING ENGINE
      • 12.29 LOCKING
      • 12.30 HANDLING JIB
      • 12.31 HANDLING SINGLE TOP
      • 12.32 HANDLING WIRE ROPE
      • 12.33 SETTING MOMENT LIMITER (OVERLOAD PREVENTION SYSTEM)
    • 13.COLD WEATHER OPERATION
      • 13.1 PRECAUTIONS FOR LOW TEMPERATURE
      • 13.2 PRECAUTIONS AFTER COMPLETION OF WORK
      • 13.3 AFTER COLD WEATHER
    • 14.LONG-TERM STORAGE
      • 14.1 BEFORE STORAGE
      • 14.2 DURING STORAGE
      • 14.3 AFTER STORAGE
    • 15.TROUBLESHOOTING
      • 15.1 WHEN MACHINE RUNS OUT OF FUEL
      • 15.2 EMERGENCY TRAVEL OPERATION
      • 15.3 IF BATTERY IS DISCHARGED
      • 15.4 OTHER TROUBLE
  • MAINTENANCE
    • 16.GUIDES TO MAINTENANCE
    • 17.OUTLINES OF SERVICE
      • 17.1 OUTLINE OF OIL,FUEL,COOLANT
      • 17.2 OUTLINE OF ELECTRIC SYSTEM
    • 18.WEAR PARTS LIST
    • 19.USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
    • 20.STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
      • 20.1 INTRODUCTION OF NECESSARY TOOLS
      • 20.2 TORQUE LIST
    • 21.PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
    • 22.MAINTENANCE SCHEDULE CHART
      • 22.1 MAINTENANCE SCHEDULE CHART
    • 23.SERVICE PROCEDURE
      • 23.1 INITIAL 250 HOURS SERVICE
      • 23.2 WHEN REQUIRED
      • 23.3 CHECK BEFORE STARTING
      • 23.4 EVERY 50 HOURS SERVICE
      • 23.5 EVERY 100 HOURS SERVICE
      • 23.6 EVERY 250 HOURS SERVICE
      • 23.7 EVERY 500 HOURS SERVICE
      • 23.8 EVERY 1000 HOURS SERVICE
      • 23.9 EVERY 2000 HOURS SERVICE
      • 23.10 EVERY 4000 HOURS SERVICE
  • SPECIFICATIONS
    • 24.SPECIFICATIONS

Komatsu

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop