$ 0
0
$ 0
0

Komatsu 930E-2 Dump Truck Operation and Maintenance Manual (CEAD012000)

Format: PDF (Printable Document)

File Language: English

File Pages: 165

File Size: 3.07 MB (Speed Download Link)

Brand: Komatsu

Model: 930E-2 Dump Truck

Book No: CEAD012000

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu 930E-2 Dump Truck Operation and Maintenance Manual (CEAD012000)

Komatsu 930E-2 Dump Truck Operation and Maintenance Manual (CEAD012000)

On a 930E-2, you’re hauling big loads in a mine or large earthmoving site, running long shifts on rough haul roads. This Operation and Maintenance Manual is what I use to set a steady service rhythm, so the truck stays predictable and doesn’t surprise you mid-shift. Say a driver reports the truck pulling on a grade and the temps creeping up; I’ll go to this book to verify the right daily checks, trace possible causes, and decide if it’s safe to run until the next scheduled stop or if we park it now.

Applications & Use Cases

  • Plan preventive maintenance so inspections, filter changes, and adjustments line up with your production schedule.
  • Standardize daily walk-arounds for operators, so they catch leaks, loose hardware, or tire issues before they become failures.
  • Verify correct operating procedures to avoid abusing the driveline, brakes, and suspension on long downhill hauls.
  • Trace early warning signs like unusual noises, warning lights, or slow response, and decide what to inspect first.
  • Train new operators and supervisors on how to run and care for the truck without shortening its life.

FAQ

Q: Can I keep this manual on a tablet in the cab?

A: Yes, it’s practical to use digitally; you can zoom diagrams and search terms, just keep the device protected from dust and vibration.

Q: Is it worth printing sections of this manual?

A: I’d print the daily/weekly check pages and keep them in the service truck so techs can mark items off during rounds.

Safety Note

Always follow the manual’s lockout, parking, and support procedures before inspecting or working under the truck.

📘 Show Index

Komatsu 930E-2 Dump Truck Index:

  • MAIN MENU
  • COVER
  • SECTION 10 – INTRODUCTION
    • FOREWORD
      • ALERTS PAGE
    • TABLE OF CONTENTS
      • TRUCK MODEL ILLUSTRATION
    • ABOUT THIS MANUAL
  • SECTION 12 – STANDARD CHARTS AND TABLES
  • SECTION 20 – SAFETY
    • Safety Rules
    • Safety Features
    • Clothing And Personal Items
    • Unauthorized Modification
    • Leaving The Operator’s Seat
    • Mounting And Dismounting
    • Fire Prevention For Fuel And Oil
    • Precautions With High Temperature Fluids
    • Asbestos Dust Hazard Prevention
    • Prevention Of Injury By Work Equipment
    • Fire Extinguisher And First Aid Kit
    • Precautions When Using ROPS
    • Precautions For Attachments
    • PRECAUTIONS DURING OPERATION
      • Safety Is Thinking Ahead
      • Safety At The Worksite
      • Fire Prevention
      • Preparing For Operation
      • Ventilation In Enclosed Areas
      • In Operator’s Cab – Before Starting The Engine
      • Mirrors, Windows, And Lights
      • OPERATING THE MACHINE
      • TOWING
      • WORKING NEAR BATTERIES
    • PRECAUTIONS FOR MAINTENANCE
      • BEFORE PERFORMING MAINTENANCE
      • DURING MAINTENANCE
      • TIRES
    • ADDITIONAL JOB SITE RULES
    • WHEN REPAIRS ARE NECESSARY
    • SPECIAL PRECAUTIONS FOR WORKING ON A 930E TRUCK
      • Preliminary Procedures Before Welding or Performing Maintenance
      • Normal Engine Shutdown Procedure
      • Engine Shutdown Procedure Before Welding or Performing Maintenance
  • SECTION 22 – WARNINGS AND CAUTIONS
  • SECTION 30 – OPERATING INSTRUCTIONS
    • PREPARING FOR OPERATION
      • Safety Is Thinking Ahead
      • At The Truck – Ground Level Walk Around Inspection
      • Cold Weather Starting
    • AFTER ENGINE HAS STARTED
    • MACHINE OPERATION SAFETY PRECAUTIONS
    • MACHINE OPERATION ON THE HAUL ROAD
    • STARTING ON A GRADE WITH A LOADED TRUCK
    • PASSING
    • LOADING
    • DUMPING
      • Raising The Dump Body
      • Lowering The Dump Body
    • TOWING
    • SAFE PARKING PROCEDURES
    • NORMAL ENGINE SHUTDOWN PROCEDURE
    • DELAYED ENGINE SHUTDOWN PROCEDURE
    • SUDDEN LOSS OF ENGINE POWER
    • RESERVE ENGINE OIL SYSTEM (Optional)
  • SECTION 32 – OPERATOR CAB AND CONTROLS
    • STEERING WHEEL AND CONTROLS
      • Horn Button
      • Telescope Lock Ring
      • Tilt Wheel Lever
      • Turn Signal/Headlight Dimmer
    • DYNAMIC RETARDING
      • Retarder Control Lever
      • Dynamic Retarder/Service Brake Pedal
      • Accelerator (Throttle) Pedal
      • Starting on a Grade With a Loaded Truck
    • GRADE/SPEED RETARD CHART
    • INSTRUMENT PANEL
    • OVERHEAD PANEL AND DISPLAYS
    • CENTER CONSOLE
      • F-N-R Selector Switch
      • Hoist Control Lever
      • Raising The Dump Body
      • Lowering The Dump Body:
      • Ash Tray
      • Lighter
      • L.H. Window Control Switch
      • R.H. Window Control Switch
      • Engine Shutdown Switch
      • Override/Fault Reset Switch
      • Retard Speed Control (RSC) Switch
      • Retard Speed Control (RSC) Adjust Dial
      • PSC Download Port
      • Engine Diagnostics Download Port
      • TCI Download Port
      • Passenger Seat
      • Engine Control System
      • Modular Mining System
      • Payload Meter And Download Connector
    • OPERATOR COMFORT
      • OPERATOR SEAT
      • HEATER / AIR CONDITIONER COMPART MENT AND CONTROLS
    • INSTRUMENT PANEL AND INDICATOR LIGHTS
      • CONTROL SYMBOLS
      • INSTRUMENT PANEL
    • PANEL GAUGES, INDICATORS, AND CONTROLS
      • Key Switch
      • Starting
      • Engine Shutdown Switch with 5 Minute Idle Timer Delay
      • Fog Lights (Optional)
      • Ladder Light Switch
      • Manual Backup Switch
      • Panel Illumination Lights
      • Cab/Air Conditioner Vents
      • Rotating Beacon Light Switch (Optional)
      • Heated Mirror Switch (Optional)
      • Wheel Brake Lock Control
      • Parking Brake Control
      • Tachometer
      • Right Turn Signal Indicator
      • High Beam Indicator
      • Left Turn Signal Indicator
      • Speedometer/Payload Meter Display
      • Voltmeter
      • Engine Oil Pressure Gauge
      • Water Temperature Gauge
      • Fuel Gauge
      • AC Drive System Temperature Gauge
      • Hourmeter
      • Hydraulic Oil Temperature Gauge
      • Rest Switch
      • Light Switch
      • Windshield Wiper and Washer
      • Panel Light Dimmer
      • Payload Meter Switch
      • OVERHEAD STATUS / WARNING INDICATORS
      • STATUS / WARNING INDICATOR LIGHT SYMBOLS
  • SECTION 40 – LUBRICATION AND SERVICE
    • 930E SERVICE CAPACITIES
    • HYDRAULIC TANK SERVICE
      • Adding Oil
    • WHEEL MOTOR SERVICE
    • COOLANT LEVEL CHECK
    • RADIATOR FILLING PROCEDURE
    • RESERVE ENGINE OIL SYSTEM (Optional)
      • Reserve Oil Tank Filling Procedure (Remote fill)
    • LUBRICATION CHART
    • 10 HOUR (DAILY) INSPECTION
    • 50 HOUR LUBRICATION AND MAINTENANCE CHECKS
    • 100 HOUR LUBRICATION AND MAINTENANCE CHECKS
    • 250 HOUR LUBRICATION AND MAINTENANCE CHECKS
    • 500 HOUR LUBRICATION AND MAINTENANCE CHECKS
    • 1000 HOURS LUBRICATION AND MAINTENANCE CHECKS
    • 2500 HOUR MAINTENANCE CHECKS
    • 5000 HOUR MAINTENANCE CHECKS
  • SECTION 42 – AUTOMATIC LUBRICATION SYSTEM
    • GENERAL DESCRIPTION
    • SYSTEM COMPONENTS
    • SYSTEM OPERATION
      • Normal Operation
      • Pressure Failure Detection Circuits
    • GENERAL INSTRUCTIONS
      • Required Lubricant For System
      • System Priming
      • Filter Assembly
    • LUBRICANT PUMP
      • Pump Housing Oil Level
      • Pump Pressure Control
      • Pressure Control Valve Adjustment
    • INJECTOR OPERATION
    • INJECTORS (SL-1 Series “H”))
      • Injector Specifications
      • Injector Adjustment
    • SYSTEM CHECKOUT
      • Lubrication Cycle Timer Check
      • Lubrication Cycle Timer Adjustment
    • SYSTEM TROUBLESHOOTING CHART
    • PREVENTATIVE MAINTENANCE PROCEDURES
      • Daily Lubrication System Inspection
      • 250 Hour Inspection
      • 1000 Hour Inspection
  • SECTION 50 – MAJOR COMPONENT DESCRIPTION
  • SECTION 60 – PAYLOAD METER III™ – INDEX
    • OPERATION SECTION
      • Introduction
      • Data Summary
      • Data Gathering
    • COMPONENT DESCRIPTION
      • System Diagram
      • Suspension Pressure Sensors
      • Inclinometer
      • Operator Display
      • Operator Switch
      • Speed Input
      • Body-Up Switch
      • Brake Lock Switch
      • Payload Meter
      • Communications Ports
      • Keyswitch Input
      • Payload Meter Power
      • Load Lights
      • Wiring and Termination
      • TCI Outputs
    • OPERATOR’S DISPLAY AND SWITCH
      • Reading the Speedometer
      • Reading the Load Display
      • Using the Operator ID
      • Using the Load and Ton Counter
      • Total Ton Counter
      • Total Load Counter
      • Clearing the Counters
      • Viewing Live Sensor Data
      • Other Display Messages
    • PAYLOAD OPERATION & CALCULATION
      • Description of Haul Cycle States
      • Haul Cycle Description
      • Load Calculation
      • Carry Back
      • Measurement Accuracy
    • SOURCES FOR PAYLOAD ERROR
      • Payload Error
      • Loading Conditions
      • Pressure Sensors
      • Swingloads
      • Speed and Distance
    • HAUL CYCLE DATA
      • Haul Cycle Data
      • Haul Cycle Warning Flags
      • A: Continuous Loading
      • B: Loading to Dumping Transition
      • C: No Final Load
      • D: Maneuvering to Dumping Transition
      • E: Average Load or Tare Used
      • F: Final Zone to Dumping Transition
      • H: False Body Up
      • I: Body Up Signal Failed
      • J: Speed Sensor Failed
      • K: New Tare Not Calculated
      • L: Incomplete Haul Cycle
      • M: Haul Cycle Too Long
      • N: Sensor Input Error
      • Alarm Records
      • Frame Torque Data
      • Sprung Weight Data
      • Maximum Speed Data
    • PC SOFTWARE OVERVIEW
      • PC Overview
      • System Configuration
      • Installing the PLMIII Software
    • DOWNLOADING DATA
    • PLMIII SYSTEM CONFIGURATION
      • Starting Communications
      • Displayed Payload Units
      • Time Units
      • Connection Menu
      • Connecting to the Payload Meter
      • Configure the Payload Meter
      • Setting the Date and Time
      • Setting the Truck Type
      • Setting the Gauge Display Units
      • Setting the Frame Serial Number
      • Setting the Truck Number
      • Setting the Komatsu Distributor
      • Setting the Komatsu Customer
      • Clean Truck Tare
      • Inclinometer Calibration
    • DATA ANALYSIS
      • Sorting on Truck Unit Number
      • Creating a Query
      • Sorting on Truck Type
      • Sorting on Date Range
      • Sorting on Time Range
      • Payload Detail Screen
      • Creating Reports
      • Summary – one page report
      • Detailed – multi-page report
      • Creating Graphs
      • Exporting Data
      • CSV Export
      • Compressed
      • To export data in ZIP format:
      • Importing Data
      • Deleting Haul Cycle Records
      • Viewing Alarms
      • Deleting Alarm Records
  • SECTION 70 – RADIO, AM / FM STEREO CASSETTE
    • SETTING THE TIME
    • GENERAL RECEIVER FUNCTIONS
      • Turning The Power On And Off
      • Display
      • Setting The Default Display
      • Adjusting Display Brightness
    • OPERATING THE RADIO
      • BAND
      • TUNE/SEEK
      • Manual Tuning
      • SEEK Mode
      • SCAN
      • AUTO
    • PROGRAMMING PRESET STATIONS
    • OPERATION OF THE WEATHERBAND (U.S.)
    • ADJUSTING THE RECEIVER SETTINGS
    • PROGRAMMABLE EJECT DEFAULT
    • CASSETTE PLAYER
      • Playing A Cassette
      • Cassette Functions
      • Bad Tape Detect
    • CASSETTE PLAYER CLEANING

Komatsu

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop