$ 0
0
$ 0
0

Komatsu PC160LC-7, PC180LC-7K, PC180NLC-7K Hydraulic Excavator Operation and Maintenance Manual (UEAM002105)

Format: PDF (Printable Document)

File Language: English

File Pages: 292

File Size: 9.38 MB (Speed Download Link)

Brand: Komatsu

Model: PC160LC-7, PC180LC-7K, PC180NLC-7K Hydraulic Excavator

Book No: UEAM002105

Type of Document: Operation and Maintenance Manual

Categories: ,

$ 40

Share:

Komatsu PC160LC-7, PC180LC-7K, PC180NLC-7K Hydraulic Excavator Operation and Maintenance Manual (UEAM002105)

Komatsu PC160LC-7, PC180LC-7K, PC180NLC-7K Hydraulic Excavator Operation and Maintenance Manual (UEAM002105)

📘 Show Index

Komatsu PC160LC-7, PC180LC-7K, PC180NLC-7K Hydraulic Excavator Index:

  • FOREWORD
    • FOREWORD
    • SAFETY INFORMATION
      • NOISE (PC160LC/PC180LC/PC180NLC-7K)
      • VIBRATION
    • INTRODUCTION
      • DIRECTIONS OF MACHINE
    • PRODUCT INFORMATION
      • MACHINE SERIAL NUMBER PLATE AND ITS LOCATION
      • ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
      • SERVICE METER LOCATION
      • YOUR MACHINE SERIAL NUMBERS AND DISTRIBUTOR
      • MACHINE SERIAL PLATE
      • FOREWORD
      • SAFETY
      • OPERATION
      • MAINTENANCE
      • SPECIFICATIONS
      • ATTACHMENTS AND OPTIONS
  • SAFETY
    • SAFETY INFORMATION
    • SAFETY LABELS
      • LOCATION OF SAFETY LABELS
      • SAFETY LABELS
    • SAFETY INFORMATION
    • SAFETY MACHINE OPERATION
      • STARTING ENGINE
      • OPERATION
      • TRANSPORTATION
      • BATTERY
      • TOWING
      • LIFTING OBJECTS WITH BUCKET
    • SAFETY MAINTENANCE INFORMATION
  • OPERATION
    • MACHINE VIEW ILLUSTRATIONS
      • OVERALL MACHINE VIEW
      • GENERAL VIEW CONTROLS AND GAUGES
    • DETAILED CONTROLS AND GAUGES
      • MONITORING SYSTEM
      • CONTROL LEVERS, PEDALS
      • SUN ROOF
      • WINDSHIELD
      • EMERGENCY EXIT FROM OPERATOR’S CAB
      • DOOR LOCK
      • CAP WITH LOCK
      • HOT AND COOL BOX
      • MAGAZINE BOX
      • ASHTRAY
      • AIR CONDITIONER CONTROLS
      • CAB RADIO
      • AUXILIARY ELECTRIC POWER
      • FUSE
      • FUSIBLELINK
      • CONTROLLERS
      • TOOL BOX
      • GREASE GUN HOLDER
      • REFUELLING PUMP
      • ACCUMULATOR
    • MACHINE OPERATIONS AND CONTROLS
      • BEFORE STARTING ENGINE
      • STARTING ENGINE
      • AFTER STARTING ENGINE
      • STOPPING THE ENGINE
      • CHECK AFTER SHUT OFF ENGINE
      • MACHINE OPERATION
      • STEERING THE MACHINE
      • SWINGING
      • WORK EQUIPMENT CONTROLS AND OPERATIONS
      • WORKING MODE
      • PROHIBITED OPERATIONS
      • GENERAL OPERATION INFORMATION
      • TRAVELING ON SLOPES
      • ESCAPE FROM MUD
      • RECOMMENDED APPLICATIONS
      • BUCKET REPLACEMENT AND INVERSION
      • PARKING MACHINE
      • MACHINE INSPECTION AFTER DAILY WORK
      • LOCKING
    • TRANSPORTATION
      • TRANSPORTATION PROCEDURE
      • LOADING AND UNLOADING WITH TRAILER
      • LIFTING MACHINE
    • COLD WEATHER OPERATION
      • COLD WEATHER OPERATION INFORMATION
      • AFTER DAILY WORK COMPLETION
      • AFTER COLD WEATHER SEASON
    • LONG TERM STORAGE
      • BEFORE STORAGE
      • DURING STORAGE
      • AFTER STORAGE
      • STARTING MACHINE AFTER LONG-TERM STORAGE
    • TROUBLES AND ACTIONS
      • RUNNING OUT OF FUEL
      • PHENOMENA THAT ARE NOT FAILURES
      • TOWING THE MACHINE
      • LIGHTWEIGHT TOWING HOLE
      • SEVERE JOB CONDITION
      • DISCHARGED BATTERY
      • OTHER TROUBLE
  • MAINTENANCE
    • MAINTENANCE INFORMATION
    • LUBRICANTS, COOLANT AND FILTERS
      • HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
      • EXPLANATION OF LUBRICATION CHART DECAL
      • ELECTRIC SYSTEM MAINTENANCE
    • WEAR PARTS
      • WEAR PARTS LIST
    • LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS
      • PROPER SELECTION
    • TIGHTENING TORQUE SPECIFICATIONS
      • TIGHTENING TORQUE LIST
    • SAFETY CRITICAL PARTS
      • SAFETY CRITICAL PARTS LIST
    • MAINTENANCE SCHEDULE
      • MAINTENANCE SCHEDULE CHART
      • MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
    • MAINTENANCE PROCEDURE
      • INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
      • INITIAL 1000 HOURS MAINTENANCE (ONLY AFTER THE FIRST 1000 HOURS)
      • WHEN REQUIRED
      • CHECK BEFORE STARTING
      • EVERY 100 HOURS MAINTENANCE
      • EVERY 250 HOURS MAINTENANCE
      • EVERY 500 HOURS MAINTENANCE
      • EVERY 1000 HOURS MAINTENANCE
      • EVERY 2000 HOURS MAINTENANCE
      • EVERY 4000 HOURS MAINTENENCE
      • EVERY 5000 HOURS MAINTENANCE
  • SPECIFICATIONS
    • SPECIFICATIONS
      • EXPLANATION OF LIFTING CAPACITY CHART
      • EXPLANATION OF LIFTING CAPACITY CHART
  • ATTACHMENTS AND OPTIONS
    • ATTACHMENTS AND OPTIONS – GENERAL INFORMATION
      • SAFETY FIRST
      • ATTACHMENT INSTALLATION
    • BUCKET WITH HOOK
      • HOOK CONDITION
      • PROHIBITED OPERATIONS
    • MACHINES READY FOR ATTACHMENTS
      • EXPLANATION OF COMPONENTS
      • HYDRAULIC CIRCUIT
      • ATTACHMENT REMOVAL AND INSTALLATION
      • OPERATION
      • LONG TERM STORAGE
      • SPECIFICATIONS
    • ATTACHMENT GUIDE
      • OTHER ATTACHMENTS
      • COMBINATIONS OF WORK EQUIPMENT
      • SELECTION OF TRACK SHOES
      • ATTACHMENT COMBINATIONS
      • BUCKET TEETH SELECTION
    • RECOMMENDED ATTACHMENT OPERATIONS
      • HYDRAULIC BREAKER
    • 2-PC BOOM
      • FEATURES OF 2-PIECE BOOM & ARM
      • SAFETY
      • OPERATION
      • TESTING AND ADJUSTING
      • TRANSPORTATION

Komatsu

Latest Product

0
    0
    Your Cart
    Your cart is emptyReturn to Shop