The LTM 1400-7.1 is a multi-axle all terrain crane. It drives to site on public roads, sets up on outriggers and works with a telescopic boom. This manual is for the person taking the crane over, usually a relief or new operator who needs the controls, setup sequence and daily routine in front of them before the first lift.
What this manual helps you do
- Learn the controls and instruments in the carrier cab and the superstructure cab.
- Follow the safety rules before you drive, set up or lift.
- Set up on outriggers in the right order and prepare the crane for travel.
- Plan lifts with the load charts and load moment limiter, then operate the telescopic boom and jib through hoisting and slewing.
- Inspect and care for the crane with the service and maintenance routines and the inspections of cranes.
Who this is for
Crane operators and operator trainers. The operator uses it at the controls and on the daily walk-round, and the trainer uses it to take a new person through the crane in the same order the book does.
FAQ
Q: What do I receive and how is it organised?
A: You get the full set of 3 PDF files, 2,666 pages in total, in English. The main manual is Publication 14622-02-02 (1,199 pages), titled Operating Instructions, alongside Manual 2 (401 pages) and Publication BAL-No. 14619-01-02 (1,066 pages).
Q: Which machine does it fit?
A: It is for the Liebherr LTM 1400-7.1 all terrain crane. Sections you'd expect to use include description of crane, safety, crane chassis operation, operation of crane superstructure, equipment, additional equipment and service and maintenance.
Q: How does it fit my job?
A: Keep it with the crane for handover, site files and operator training. It gives everyone the same reference for setup, operation and daily checks.
If you need this crane documented and every operator working from the same book, this set does that.
Click here to view the preview (PDF)
📘 Show Index
Table of Contents:
- Publication 14622-02-02 (1,199 pages)
- Description of crane
- Terminology
- Product description
- Technical data
- Safety
- Traffic regulations
- Break-in instructions
- Job planning
- Crane chassis operation
- Operating and monitoring instruments on the crane chassis
- Before starting to travel
- Axle suspension and axle blocking system
- Operation of crane superstructure
- Operating and monitoring instruments on the crane superstru
- LICCON computer system
- Crane start up and taking the crane out of service
- Equipment
- Safety technical guidelines for assembly and disassembly
- Fixed lattice jib – TF
- Luffing lattice jib -TN
- Additional equipment
- Heater/engine pre-heating*
- Emergency control
- Sliding beam monitoring
- Service and maintenance
- Maintenance and service – General
- Maintenance intervals – Crane chassis
- Maintanance intervals – Crane superstructure
- Inspections of cranes
- Periodic crane inspections
- Inspection of crane wire ropes
- Inspection of pneumatic brake system for drum brakes
- General notes
- Supplementary service work
- Index
- Manual 2 (401 pages)
- Important notes about the documentation
- Safety
- Introduction
- “Crane operating instructions.” content
- Technical safety instructions for assembly and disassembly
- Equipment
- Rope pulleys
- Ropes
- Crane specific notes for assembly and disassembly
- disassembling the fixed lattice jib
- disassembling the sharp lattice jib
- Fixed lattice jib – TF
- Safety
- Description
- Fastening points
- Luffing lattice jib – TN
- Safety
- Description
- Components of luffing lattice jib
- Boom nose N-end section
- Auxiliary jib
- Description
- Safety
- Assembling of auxiliary jib
- Publication BAL-No. 14619-01-02 (1,066 pages)
- Description of crane
- Terminology
- Product description
- Technical data
- Safety
- Traffic regulations
- Break-in instructions
- Operational planning
- Operation – crane chassis
- Operation and control instruments – crane chassis
- Before starting up the vehicle
- axle locking system
- Operation – crane superstructure
- Operation and control instruments – crane superstructure
- LICCON computer system
- Starting up the crane
- Equipment
- Safety technical guidelines for assembly and disassembly
- Fixed lattice jib – TF
- Luffing lattice jib – TN
- Additional equipment
- engine pre-heating
- Emergency control
- Sliding beam monitoring
- Maintenance and service
- Maintenance and service, general
- Maintenance intervals – crane chassis
- Maintenance intervals – crane superstructure
- Crane inspections
- Periodic crane inspections
- Inspection of crane wire ropes
- Inspection of air brake system (drum brakes
- General notes
- Bulletin – fire prevention in the engine compartment and im
Liebherr PDF Manuals
All Crane Manuals