The Link-Belt ATC-3250 is an all terrain crane that travels on public roads and works on site with a telescopic boom. A parts manual like this is used by mechanics, parts counters, and fleet staff to identify the correct replacement component. For an ATC-3250, this is the manual to use for parts identification and ordering.
What this manual helps you do
- Identify replacement parts from exploded-view drawings and item numbers
- Look up parts by assembly, including carrier chassis, axles and suspension, steering and brakes, and electrical system
- Match components to assemblies such as the engine and drive train, hydraulic system, cab and superstructure, and telescopic boom and hoist
- Confirm descriptions and quantities before placing an order
- Locate parts related to the crane cab, wheel and tire, counterweight, cable harness, pulley carrier, and other listed assemblies
Who this is for
This is for a rental fleet maintenance team, parts counter, independent crane service shop, or dealer technician working on a Link-Belt ATC-3250. It helps the person ordering or fitting a part verify the assembly breakdown before the purchase is made.
FAQ
Q: What do I receive, and how is it organised?
A: You receive 1 PDF file with 1,455 pages. The ATC-3250 Spare Parts List is organised by assembly and is provided in English, German, and French.
Q: Which machine or serial number does it fit?
A: It is identified for the Link-Belt ATC-3250 all terrain crane. Match the machine model to ATC-3250 when using the catalog.
Q: How does it fit the job I’m doing?
A: Use it when a part needs to be identified, matched to an assembly, and ordered by the correct item reference. It gives the parts-catalog information needed at the shop or parts counter.
If your crane is a Link-Belt ATC-3250, this is the right parts manual for identifying and ordering its replacement components.
Click here to view the preview (PDF)
📘 Show Index
Table of Contents:
- MOTOR
- GENERAL ARRANGEMENT ASSEMBLIES
- FRAME
- FRAME ASSY
- SUPPORT PLATE INSTALLATION
- FASTENING PARTS
- SNATCH BLOCK HOLDER
- STEERING AXLE ASSY I 10×8
- AXLE HOUSING
- WHEEL BRAKE ASSY left
- WHEEL BRAKE ASSY right
- EXPANDER UNIT ASSY
- PLANETARY GEAR DRIVE
- AXLE DRIVE
- STEERING AXLE ASSY II 10×8
- RIGID AXLE ASSY III
- WHEEL BRAKE ASSY
- RIGID AXLE III
- DRIVE 10×8
- STEERING AXLE ASSY IV
- STEERING AXLE ASSY V
- AXLE DRIVE ASSY
- AXLE INSTALLATION
- POTENTIOMETER INSTALLATION
- RADIATOR INSTALLATION
- HYDRAULIC PLAN cooling water
- COOLING SYSTEM
- DRIVE UNIT INSTALLATION
- AIR CLEANER INSTALLATION
- DRY AIR CLEANER ASSY
- ENGINE
- DRIVE POWER UNIT ASSY
- ADDITIONAL PARTS engine
- WATER SEPARATOR INSTALLATION
- CLUTCH INSTALLATION
- POWER DIVIDER INSTALLATION
- HYDRAULIC PLAN power divider
- TRANSMISSION ASSY
- ADDITIONAL PARTS housing
- CONTROL UNIT
- CLUTCH DISENGAGER
- CONTROL VALVE
- STEERING INSTALLATION
- HYDRAULIC PLAN steering
- ANGLE GEAR INSTALLATION
- JOINT SHAFT INSTALLATION
- JOINT SHAFT INST without Telma
- JOINT SHAFT INSTALLATION 10×8
- CONTROL SYSTEM
- BRAKE CYLINDER INSTALLATION 1.axle
- BRAKE CYLINDER INSTALLATION 2.axle
- BRAKE CYLINDER INSTALLATION 3.axle
- BRAKE CYLINDER INSTALLATION 4.axle
- BRAKE CYLINDER INSTALLATION 5.axle
- AIR RESERVOIR INSTALLATION
- AIR RESERVOIR
- PNEUMATIC PLAN TRAILER brake system
- BRAKES ADD PARTS
- BRAKES ADD PARTS 3. Axle
- PNEUMATIC CONNECTION engine
- UNDER-CARRIER BRAKE
- REPAIR PARTS
- ELECTRICAL SYSTEM
- CABLE HARNESS cab chassis
- CABLE HARNESS chassis
- RETROFIT KIT wiring
- CAB ELECTRIC SYSTEM
- DASHBOARD INSTALLATION
- CABLE HARNESS dashboard
- ELECTRICAL ENGINE EQUIPMENT
- PRIORITY LIGHT INSTALLATION yellow
- BATTERY AND ACCESSORIES
- RADIO INSTALLATION "CD"
- AIR CONDITIONER
- TACHOGRAPH INSTALLATION 2.driver, mph
- LIGHT CARRIER INSTALLATION
- CABLE HARNESS ASSY front/left
- CABLE HARNESS ASSY right
- COVERING PART ASSY left
- COVERING PART ASSY right
- PLUG SOCKET INST trailer 24V
- PLUG SOCKET INSTALLATION
- EXHAUST SYSTEM rustproof
- ENGINE HOOD INSTALLATION
- HOOD COVER ASSY front
- HOOD COVER ASSY rear
- COVER ASSY
- COVER INSTALLATION
- PLATFORM INSTALLATION left
- PLATFORM INSTALLATION right
- FENDER INSTALLATION 3000 broad
- FENDER INSTALLATION 3200 broad
- FENDER INSTALLATION
- CONVERSION KIT fender 3200 broad (cab)
- MUD FLAP INSTALLATION
- FUEL TANK INSTALLATION
- FUEL TANK ASSY
- TRAILER COUPLING INSTALLATION
- COUPLING INSTALLATION front
- TIRE TYPES 445/95R25 X-Crane Michelin
- WHEEL AND TIRE 445/95R25 X-Crane Micheli
- TIRE TYPES 20.50 R25VHB Bridgestone
- WHEEL AND TIRE 20.50 R25 VHS Bridgestone
- TIRE TYPES 20.50 R25 XGC Michelin
- WHEEL AND TIRE 20.50 R25 XGC Michelin
- CAB ASSY
- GLAZING INSTALLATION
- SLIDING WINDOW ASSY left
- SLIDING WINDOW ASSY right
- CONSOLE INSTALLATION
- INSIDE LINING INSTALLATION
- WIPING AND WASHING SYSTEM
- WATER TANK INSTALLATION
- SEAT INSTALLATION
- SEAT ASSY left
- SEAT ASSY right
- DOOR INSTALLATION left/right
- DOOR ASSY left
- DOOR ASSY right
- FRONT COVERING INSTALLATION
- FRONT GATE INSTALLATION
- PEDAL ARRANGEMENT
- CAB EQUIPMENT
- CAB INSTALLATION
- MIRROR INSTALLATION
- ROOF INSTALLATION
- SWITCHBOARD INSTALLATION
- INSTRUM SUPPORT INSTALLATION
- DECAL KIT – INSTALLATION
- DECAL KIT Splash-water protection
- DECAL KIT
- COVER INSTALLATION under cab
- GUARD PLATE ASSY air conditioner
- COVER INSTALLATION air conditioner
- FOOTSTEP INSTALLATION
- LICENSE BRACKE INSTALLATION front/rear
- BATTERY BRACKET INSTALLATION
- BATTERY BOX ASSY
- LADDER INSTALLATION vehicle width 3000
- LADDER INSTALLATION
- LADDER INSTALLATION vehicle width 3200
- HEATING INSTALLATION
- HEATER
- AIR CONDITIONER INSTALLATION
- COMPRESSOR INSTALLATION
- CONDENSER INST air conditioner
- CENTRAL LUBRICAT INSTALLATION 38 point
- HYDRAULIC SYSTEM
- OIL RESERVOIR INSTALLATION
- OIL RESERVOIR ASSY
- HYDRAULIC PLAN oil reservoir
- PUMP INSTALLATION
- HYDRAULIC PLAN pump installation
- HOSE ACCESSORIES
- HYDRAULIC PLAN fan drive
- COVERING INSTALLATION left 3000 broad
- COVERING INSTALLATION left 3200 broad
- COUNTERWEIGHT INSTALLATION
- OIL COOLER INSTALLATION
- COOLING SYSTEM INSTALLATION
- COOLING SYSTEM delivery scope
- OIL COOLER INSTALLATION auxiliary
- HYDRAULIC PLAN auxiliary oil cooler
- POWER PACK INSTALLATION
- ENGINE-SPARE PARTS
- CABLE HARNESS ASSY
- CABLE ASSY ASLI-crane boom
- CABLE ASSY telescopic control sys
- CABLE ASSY transmitter ASLI
- CABLE ASSY slip ring
- CABLE ASSY generator
- CAB ELECTRIC SYSTEM central electric
- CABLE HARNESS central electric
- CAB ELECTRIC SYSTEM standard equiment
- CABLE HARNESS dashboard I
- CABLE HARNESS dashboard II
- CABLE HARNESS dashboard III
- CABLE HARNESS dashboard IV
- ELECTRICAL SYSTEM crane boom
- ELECTRICAL SYSTEM delivery scope
- CAB ELECTRIC SYSTEM seat
- CABLE HARNESS ASSY seat
- CAB ELECTRIC SYSTEM AML timing
- FAN INSTALLATION fan cab
- CABLE ASSY
- CAB ELECTR SYSTEM
- EXHAUST SYSTEM
- FUEL SYSTEM
- CRANE CAB
- CRANE CAB ASSY
- PLATE INSTALLATION
- SLIDING DOOR rigid
- OUTER DOOR PANEL ASSY
- WINDOW PANE
- COVER ASSY loudspeaker
- ADDITIONAL PARTS
- PARTS KIT key
- CRANE CAB INSTALLATION
- MIRROR INSTALLATION shoring
- SEAT ASSY
- FIRE-EXTINGUISH INSTALLATION
- BATT BRACKET INSTALLATION
- HEATING INSTALLATION Thermo 90ST
- HEATER Thermo 90 ST delivery scope
- RETROFIT KIT air conditioner
- CENTRAL LUBRICAT INSTALLATION
- VALVE GROUP
- VALVE GROUP delivery scope
- HYDRAULIC PLAN slewing gear drive
- HYDRAULIC PLAN slewing gear brake free
- HYDRAULIC PLAN hoisting winch
- HYDRAULIC PLAN derrick cylinder
- HYDRAULIC PLAN derrick cyl free
- HYDRAULIC PLAN Telescopic Cyl
- HYDRAULIC PLAN telescopic cyl lock
- HYDRAULIC PLAN counterweight
- CONVERSION KIT counterweight-hydraulic
- DOLLY SELECTION INSTALLATION
- DERRICK CYLINDER INSTALLATION
- COVERING INSTALLATION
- CRANE UPPERSTRUCTURE INSTALLATION
- TELESCOPIC BOOM ASSY
- BASIC BOOM ASSY
- BASIC BOOM + BOOM ADD-PARTS
- BOOM ASSY 1
- BOOM ASSY 2
- BOOM ASSY 3
- BOOM ASSY 4
- BOOM ASSY 5
- BOOM ASSY 6
- CRANE BOOM 6 + Welding Parts
- TELESCOPIC CYL ASSY delivery scope
- SLEWING GEAR INSTALLATION
- SWIVEL BEARING INSTALLATION
- FOLDING JIB INSTALLATION 5,6m
- FOLDING JIB delivery scope 5,6m
- FOLDING JIB ASSY 5,6m
- FOLDING JIB ASSY 5,6m elektic
- PULLEY CARRIER INSTALLATION
- PULLEY CARRIER delivery scope
- PULLEY CARRIER ASSY
- SECTION INSTALLATION 6m
- SECTION ASSY 6m
- SECTION ASSY 6m electric
- JIB POINT INSTALLATION 7,5m
- JIB POINT 7,5m delivery scope
- JIB POINT ASSY 7,5m
- JIB POINT ASSY 7,5m electric
- GUIDE FRAME ASSY
- TRANSPORT SUPPORT ASSY
- RETROFIT KIT quick-coupler for tele
- BASIC BOOM Modification
- LMB INSTALLATION AML "USA"
- HOOK BLOCK 25t single hook
- HOOK BLOCK 80t single hook
- CRANE HOOK 10t
- FRONT BUILD PULLEY INSTALLATION
- FRONT BUILD PULLEY ASSY electric
- HOISTING WINCH INSTALLATION
- HOISTING WINCH INSTALLATION 2.winch
- HYDRAULIC PLAN 2.winch
- HOISTING WINCH INST electric 2.winch
- PULLEY INSTALLATION
- HOSE REEL ASSY
- TELESCOPIC CYLINDER ASSY
- HYDRAULIC CYLINDER ASSY
- CABLE DRUM ASSY
- SWITCH AMPLIFIER AML
- LOWERING BRAKE VALVE ASSY
- CHECK VALVE ASSY
- PRESSURE RELIEF VALVE ASSY
- SOLENOID VALVE ASSY
- TOW HOOK ASSY
- SOLENOID VALVE 5/2 ASSY
- MULTI WAY VALVE 3/2
- RELAY VALVE ASSY
- BRAKE VALVE ASSY
- BLEED VALVE ASSY
- STEER CYLINDER ASSY
- STEER CYLINDER
- MULTI WAY VALVE 4/2
- CONTROL BLOCK ASSY
- REFRIGERANT LINE
- SUSPENSION CYLINDER ASSY
- COMPRESSED-AIR PURIFYNG DRYING ASSY
- SOLENOID VALVE 3/2
- AXIAL PISTON MOTOR
- CONTROL BLOCK
- RETURN FLOW FILTER ASSY
- AIR DEHUMIDIFIER ASSY
- SLEWING GEAR DRIVE ASSY
- AXIAL PISTON PUMP ASSY
- EXTENDING CYLINDER ASSY
- MULTI WAY VALVE -3/2 ASSY
- CABLE WINCH ASSY
- CABLE DRUM
- OIL COOLING SYSTEM
- LOCK VALVE TRUNK
- HEATER Thermo 90ST
- DERRICK CYLINDER ASSY
- MULTIPLE DISC BRAKE wearing parts
- CONTROL VALVE ASSY
- PUMP ASSY
- BRACKET ASSY
- LOCK VALVE TRUNK ASSY
- MULTI WAY VALVE 2/2
- AXIAL PISTON MOTOR CPL
- BRAKE CYLINDER ASSY
- STEERING ROD ASSY
- ANGLE GEAR ASSY
- WEIGHT ASSY with bracket
- DOOR HANDLE ASSY
- SUPPORT PLATE ASSY
- SOCKET PIN ASSY
- PROXIMITY SWITCH ASSY
- STEERING GEAR ASSY
- JOINT SHAFT
- COUPLING
- WATER SEPARATOR ASSY
- CARDAN SHAFT BEARING
- AXIAL PISTON MOTOR ASSY
- SOCKET PIN
- TRANSPORT SUPPORT IN ASSY
- SHORING CYLINDER
- BALL JOINT
- BRAKE CYLINDER
- COUPLING HEAD color of cover red
- COUPLING HEAD color of cover yellow
- PLATEAU SUPPORT INSTALLATION
- SUPPORT MOUFLE LONG
- INSTALLATION D ESSIEU
- POTENTIOMETRE INSTALLATION
- RADIATEUR INSTALLATION
- GROUPE COMMANDE INSTALLATION
- FILTRE D AIR INSTALLATION
- FILTRE D AIR A SEC CPL
- SEPARATEUR D'EAU INSTALLATION
- EMBRAYAGE INSTALLATION
- BOITE DE TRANSFERT INSTALLATION
- DIRECTION INSTALLATION
- ENGRENAGE ANGULAIRE INSTALLATION
- ARBRE A CARDAN INSTALLATION
- ARBRE A CARDAN INSTALLATION 10×8
- RESERVOIR D´AIR INSTALLATION
- RESERVOIR AIR COMPRIME
- INSTALLATION ELECTRIQUE
- FEU TOURNANT INSTALLATION jaune
- INSTALLATION ELECTRIC
- SUPPORT DE LAMPES INSTALLATION
- SUPPORT D ECLAIRAGE CPL a gauche
- SUPPORT D ECLAIRAGE CPL a droite
- CAPOT-MOTEUR INSTALLATION
- PLATE-FORME INSTALLATION a gauche
- PLATE-FORME INSTALLATION a droite
- AILE INSTALLATION 3000 large
- AILE INSTALLATION 3200 large
- AILE INSTALLATION
- JEU DE REMPLACEM aile 3200 large (cabin)
- GARDE BOUE AR INSTALLATION
- RESERVOIR A CARBURANT INSTALLATION
- VITRAGE INSTALLATION
- REVETEM INTER INSTALLATION
- RESERVOIR D EAU INSTALLATION
- PORTE INSTALLATION a gauche/a droite
- REVETEMENT FRONTAL INSTALLATION
- HAYON AVANT INSTALLATION
- TOIT INSTALLATION
- SUPPORT D'APPAREIL INSTALLATION
- JEU DE PLAQUES – INSTALLATION
- MARCHEPIED INSTALLATION
- ATTACHE BATTERIE INSTALLATION
- ECHELLE INSTALLATION
- CHAUFFAGE INSTALLATION
- CLIMATIESEUR INSTALLATION
- SYSTEM HYDRAULIQUE
- RESERVOIR D HUILE INSTALLATION
- POMPE INSTALLATION
- PLAN HYDRAULIQUE pompe installation
- SYST REFROIDISSMENT INSTALLATION
- CABLE CPL telescop sys de commande
- CABLE CPL bague glissante
- CABLE CPL generatrice
- SYS ELECTRIC CABIN èquipement standard
- CABLE CPL
- VIDEO INSTALLATION
- PLAQUE INSTALLATION
- CABINE INSTALLATION
- EXTINCTEUR INSTALLATION
- CHAUFFAGE INSTALLATION Thermo 90ST
- GRAISSAGE CENTRAL INSTALLATION
- RESERV D HUILE INSTALLATION
- CYL BASCULANTE INSTALLATION
- REVETEMENT INSTALLATION
- DISPOS ROTATION INSTALLATION
- COURONNE ROTATIF INSTALLATION
- FLECHETTE INSTALLATION 5,6m
- FLECHETTE INSTALLATION 7,5m
- FLECHETTE INSTALLATION
- TAMBOUR DE CABLE CPL
- PRÈPARATION EN AIR COMPRIMÈ CPL
- DESICCATEUR DE AIR CPL
- TROUIL A CABLE CPL
- TAMBOUR DE CABLE
- SUPPORT CPL
- CORPS DE VALVE D'ARRÊT CPL
- POIDS CPL avec support
- PLATEAU SUPPORT CPL
- CYLINDRE A SUPPORT
Link-Belt PDF Manuals
All Crane Manuals